My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 Safe Routes to Schools Presentation
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2023
>
09-05-2023 Council Meeting
>
5.2 Safe Routes to Schools Presentation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2023 1:25:52 PM
Creation date
9/1/2023 1:25:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EAGLEVIEW ELEMENTARY This plan does not represent a comprehensive list of <br /> The planning team has a lot of discussions and every project that could improve conditions for <br /> observations regarding what could be done to walking and bicycling in the neighborhood.Instead, <br /> improve safety and ease bicycle and pedestrian it calls attention to key conflict points and potential <br /> travel to/from Eagleview from both Pequot Lakes improvements. Recommendations range from <br /> and Breezy Point. simple striping changes and signing to more <br /> significant changes to the streets,intersections,and <br /> Both traffic volume and traffic speed were identified school infrastructure. <br /> as significant barriers and safety concerns along the <br /> entirety of County Road 11.County Road 11 is a Engineering recommendations are described on the <br /> major east west corridor connecting two of the following pages. Recommendations are planning- <br /> countys larger communities.In addition,the level concepts and will require additional study to <br /> seasonal traffic is significant along the corridor as confirm feasibility and to finalize project <br /> well leading to additional volumes. All of this creates prioritization. <br /> challenges and safety concerns regarding access <br /> to/from Eagleview onto County Road 11 for school MAPS <br /> buses,parent traffic,and bicycle and pedestrians The Maps below provide illustrations of certain <br /> showing a clear and present safety need for aspects of the existing conditions.The first map is a <br /> potential trail development along County Road 11 density heat map of the student population within <br /> and intersection improvements at Eagleview and the Pequot Lakes School District. This map will be <br /> County Road 11 useful to planners and decision makers alike,as they <br /> prioritize the allocation of public funds and <br /> The responses from the parent survey indicated resources to best serve the transportation needs of <br /> there was a significant safety concern that impacted the community. <br /> parents'decisions to not allow their students to walk <br /> or bike to school. Currently there is no continuous The Second Map illustrates the relative location of <br /> pedestrian facility between Pequot Lakes,and the two school sites in relation to one another and <br /> Breezy Point where Eagleview bisects the two the City of Pequot Lakes. <br /> communities.Additional safety concerns along the <br /> County Road 11 corridor include poor drainage at <br /> various intersections along the route. <br /> Recommendations were prioritized on the basis of <br /> community and stakeholder input,traffic and <br /> roadway conditions,proximity to schools,and <br /> proximity to and use by priority populations to <br /> address equity concerns. <br /> 17 I Minnesota Safe Routes to School t *0 tr 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.