My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1 Preliminary Plat of the Heart of the Good Life Second Addition
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2023
>
June 26, 2023
>
3.1 Preliminary Plat of the Heart of the Good Life Second Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2023 10:13:34 AM
Creation date
6/21/2023 10:13:33 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicable Regulations: <br /> Section 17-5.6 of the Ordinance contains the requirements for the Patriot <br /> Development(PD)Zone: <br /> Section 17-5.16 PATRIOT DEVELOPMENT(PD) <br /> 1. Purpose and Intent: To support and facilitate public or private <br /> development of this area by creating recreational, multi-family <br /> residential, commercial and industrial opportunities to enhance the <br /> value and quality of life within our community. Multi-family <br /> residential development must be located between the Paul Bunyan <br /> Trail and the future extension of Larsen Parkway. <br /> 2. Compatibility: The Patriot Development zone is established on an 85 <br /> acre parcel located in the City of Pequot Lakes adjacent to four-lane <br /> Highway 371 and the Paul Bunyan State Trail. <br /> 3. Lot, Use and Density Requirements: <br /> P <br /> D <br /> Lot width—feet, minimum 50 <br /> Buildable lot area—square feet, minimum io,000 <br /> Setback, right of way,City road-feet, minimum 30 <br /> Setback,right of way, County or State road,feet, minimum 30 <br /> Setback,between buildings—feet, minimum io <br /> Setback,side yard—feet, minimum 10 <br /> Setback,rear—feet,minimum io <br /> Setback,sign—feet, minimum 1 <br /> Setback,parking from building or lot line —feet, minimum 10 <br /> Impervious Coverage—percent,maximum 75 <br /> Building height—feet,maximum, principal structure—feet, 35 <br /> maximum <br /> Building height, non-occupied accessory structure—feet, 25 <br /> maximum <br /> Building above highest groundwater level—feet, minimum 3 <br /> Pequot Lakes Staff Report 3.1-3 <br /> June 26,2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.