Laserfiche WebLink
Building above highest groundwater level—feet, 3 <br /> minimum <br /> 4. Performance Standards. The following performance standards apply <br /> to all development in this zone: <br /> A. Impervious Coverage. Impervious coverage may be increased by <br /> up to 10%,not to exceed 60%of the property—if the following is <br /> provided and approved by the City: <br /> (1) A storm water retention plan showing containment of the <br /> 10-year,24-hour storm event on the parcel. <br /> (2) Direct runoff of stormwater to adjacent properties and <br /> wetlands shall be eliminated through the use of berms, <br /> infiltration ponds, swales, filtration strips or other <br /> permanent means. <br /> Effective Date: This ordinance amendment shall be in full force and effect from and after passage and <br /> publication according to state law. <br /> Repeal: This ordinance shall repeal all ordinances inconsistent herewith. <br /> Passed by the Pequot Lakes City Council this 5TH day of June,2023. <br /> Tyler Gardner <br /> Mayor <br /> ATTEST: <br /> 2-Z.1406/161C" ) <br /> Richard Spiczka <br /> City Administrator <br />