My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 HOTGL - School Request
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2023
>
06-05-2023 Council Meeting
>
5.2 HOTGL - School Request
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 1:50:13 PM
Creation date
6/1/2023 1:50:12 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ro 1.,.. <br /> PEQUOT LAKES <br /> May 16,2023 <br /> To: Pequot Lakes City Council <br /> From: Kurt Stumpf,Pequot Lakes School District Superintendent <br /> Re: Interest in Property <br /> Thank you for the ongoing collaboration with the Pequot Lakes School District. Our continuous <br /> partnership benefits our students and families as well as city and district residents. For <br /> instance,the City's recent lease of Olson Street to the District has had a major impact on <br /> students and visitors of the District. The District was able to add thirty-three parking spaces to <br /> Olson Street,with the only expense being materials. <br /> As the District continues to evaluate and investigate our current and possible future facility <br /> needs,we again are looking to partner with the City of Pequot Lakes. Thank you for considering <br /> the following request. <br /> Land Partnership <br /> Request: The City of Pequot Lakes consider sending a Letter of Intent to the District <br /> highlighting their interest in"selling"($1)roughly 25-35 acres of land in the Heart of the Good <br /> Life in order for the District to build two baseball and two softball fields as shown in Diagram 1. <br /> The District understands the layout of the fields will likely need to be altered to maximize the <br /> land usage on the south end of the property. <br /> Rationale: <br /> The District property located at Olson Street is land locked and lacks sufficient outdoor space to <br /> meet the needs of students. Over 6o students,staff,parents and community members <br /> participated in a Facilities Planning Team. During this 5-night series,Facilities Planning Team <br /> members toured district facilities,reviewed the facility maintenance needs and the enrollment <br /> study as well as worked on prioritizing a list of potential facility improvements from students <br /> and staff. <br /> The additional space for two baseball and two softball fields was a recommendation by the <br /> Facilities Planning Team. This recommendation aligns with the discussions that took place in <br /> 2017 between the City of Pequot Lakes and the District. <br /> It is important to note that the proportions of the property are as critical as the total area itself. <br /> The range of 25-35 acres is the result of more investigation on the proposed facility,such as <br /> parking,site access,and site water retention. The rectangle in Diagram 1 scales at roughly 20 <br /> acres,a corner or two could get trimmed but it all depends on proportions of the property <br />
The URL can be used to link to this page
Your browser does not support the video tag.