My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 - Water/Wastewater Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2008
>
09-02-2008 Council Meeting
>
08 - Water/Wastewater Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2014 3:23:43 PM
Creation date
10/20/2014 12:54:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Police gr. City of Pequot City Hall <br /> 218-568-8111 F Lakes 218-568-5222 <br /> Fax 218-568-5647 1. 111 Fax 218-568-5860 <br /> '1pd @pequotlakes-mn.gov = 4638 County Road 11 cityhall @pequotlakes-mn.gov <br /> Pequot Lakes,MN 56472 <br /> www.pequotlakes-mn.gov <br /> Mayor/City Council/City Clerk <br /> Pequot Lakes,MN <br /> Water/Wastewater Report <br /> August 2008 <br /> POTABLE DRINKING WATER <br /> Facilities Performance: <br /> Average daily gallons pumped: 164,884 gallons <br /> Maximum daily gallons pumped: 235,000 gallons <br /> Minimum daily gallons pumped: 115,000 gallons <br /> Total monthly gallons pumped: 4,287,000 gallons (as of the 25th) <br /> Average daily chlorine concentration: .27mg/1 <br /> Required chlorine concentration: .2 to.5 mg/1 <br /> Average daily fluoride concentration: 1.2 mg/1 <br /> Required fluoride concentration: 0.9 mg/I to 1.5 mg/I <br /> Treatment Chemicals Used for the Month: 16.9 gals Fluoride <br /> 33.5 lbs Chlorine <br /> II. Operations and Maintenance: <br /> • The MN Department of Health Monthly Fluoridation Report was completed and <br /> submitted. <br /> • Continually have been re-mapping water shut-offs and extending those that need it to <br /> the surface. Encountered one shut-off that is leaking,and will schedule a time when the <br /> valve will be replaced. <br /> • On the 25th, Dean with Fargo Water and Rick Wanner with American Flow, were here <br /> to look at a couple of fire hydrants that were problematic this spring while flushing. <br /> Repairs were made,however at the hydrant next to the Oasis,the water could not be <br /> shut off completely after several attempts. It was concluded that the hydrant will need a <br /> new rubber seat in the bottom of the barrel,which will require the water main to be <br /> shut-down during the repair, since no isolation valve is at this hydrant. Business owners <br /> will be notified as to when and approximately how long the repairs will take. <br /> • 13 work orders were completed <br /> • 18 locates were received <br /> • 106 curb stops have been located,re-mapped and raised where needed, for August. <br />
The URL can be used to link to this page
Your browser does not support the video tag.