My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11.02 - Cole Memorial Building Parking Lot Project
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2008
>
08-05-2008 Council Meeting
>
11.02 - Cole Memorial Building Parking Lot Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2014 3:39:12 PM
Creation date
10/20/2014 8:53:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ANDERSONAnderson Brothers Construction Company <br /> BROTHERS P.O. Box 668 <br /> Brainerd,MN 56401 <br /> 218-829-1768 • Fax 218-829-7607 <br /> opp■I dim <br /> LarlalLowIll■ AIM Building Our Communities Since 1940 <br /> - I= An Equal Opportunity Employer <br /> II Al= <br /> July 23, 2008 <br /> City of Pequot Lakes <br /> Attn: Dave <br /> 4638 Co. Rd. 11 <br /> Pequot Lakes, MN 56472 <br /> RE: Cole Memorial Bldg. (parking lot)) <br /> We are pleased to quote the parking lot project,per our design, as follows: <br /> Grading to include: $7,100.00 <br /> • Bituminous removal <br /> • Sidewalk removal <br /> Remove excess common <br /> • Common excavation <br /> • Tree Removal <br /> Utilities (storm sewer) $5,495.00 <br /> • 12"HDPE storm sewer pipe <br /> • Catch basin structure/casting <br /> Concrete $13,600.00 <br /> • 408 LF B612 curb& gutter <br /> • 2,138 SF 4" sidewalk <br /> • 94 LF curb face sidewalk <br /> Surfacing(including plans & design) $14,000.00 <br /> • Sub grade prep. <br /> • 5" Cl. 5 gravel surface <br /> • 2-1/2"hot mix bituminous wear course <br /> • Striping <br /> Total $40,195.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.