My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11.01 - Accept Quote from EL Builders for Cole Memorial Building Roof
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2008
>
08-05-2008 Council Meeting
>
11.01 - Accept Quote from EL Builders for Cole Memorial Building Roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2014 3:38:42 PM
Creation date
10/20/2014 8:44:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> United Building Centers <br /> UBC <br /> ' Center Location:PEQUOT LAKES,MN <br /> Center Telephone:(800)944-5020,(218)568-4040 <br /> Center Address:4325E SELEY ST <br /> P.O.BOX 365 PEQUOT LAKES,MN 56472 <br /> Proposal <br /> CITY OF PEQUOT LAKES COLE BUILDING ENTRY ROOF <br /> Customer Name Job Name <br /> PEQUOT LAKES <br /> Address Job address <br /> City State ZIP Project Type Customer Account Number <br /> BOB <br /> Home Phone Work Phone SALESMAN <br /> EST DATE 5-8-08 <br /> E-mail Project Installation Date(seise n coflesm beyond our anima) <br /> It is our pleasure to submit specifications and plans for: <br /> TAKE OFF PROJECTOR BUILDING <br /> FRAME WALL AND INSTALL WN4DOW <br /> INSTALL RUBBER ROOFING ON ENTRY AREA <br /> REPLACE SHAKE TYPE FRONT AREA <br /> REPLACE WOOD ON POSTS IN FRONT OF BUILDING OR REPLACE WITH NEW POSTS <br /> PRICE INCLUDES DUMPSTER FOR OLD NETERIAL <br /> LABOR BID ONLY <br /> To supply material and labor,complete in accordance with above specifications,for the sum of: $ $4,950.00 <br /> This Proposal,together with Seller's sketch or description as above referred to or attached,shall when accepted by Purchaser constitute the full and complete <br /> agreement of the parties.Any alteration or deviation from this proposal will only be executed upon Metter agreement for same and will become an extra charge or <br /> credit to the sum mentioned in this Proposal. The Purchaser will furnish,without cost,electric power for the tools used in construction ruction of said budding and/or <br /> improvement. Notwithstanding the payment provisions below,the seller reserves the right to file a timely Mechanics Lien to secure its claim. <br /> THIS PROPOSAL NOT BINDING ON SELLER UNLESS EXECUTED BY AUTHORIZED AGENT OF SELLER AND UNLESS THE <br /> PURCHASER FURNISHES SELLER ACCEPTABLE PROOF OF FINANCIAL RESPONSIBILITY. <br /> 1. PAYMENT: The Purchaser shall pay UBC for the goods,materials,and services plus any applicable taxes,as fohbws: <br /> ()upon execution of this Contract $ <br /> n upon first delivery of materials $ <br /> (ii)upon final completion of this 100% $4,950.00 <br /> 2. CHANGES: Any changes made in the specifications as outlined in this contract necessitating additions or changes to materials or labor shall not be <br /> included or covered by this Contract. Any such changes and adjustments must be authorized in a written Change Order,signed by the <br /> Purchaser and UBC. <br /> 3. DELAY/ UBC shall not be responsible for delays in delivery or installation due to the unavailability of materials,weather,fire,labor disputes,war, <br /> DAMAGE: government regulations,or any causes beyond its control,not shy t be hale for any consequential damages of any nature however <br /> caused. Materials delivered to the lion address,if stolen,miskdd or damaged,we be the responsibility of the Purchaser. <br /> 4. LATE Interest shall be due and payable at the rate of twenty-four percent(24%)per annum from the date a payment is due to the date the sum is <br /> PAYMENTS: paid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.