Laserfiche WebLink
(Knotty Pine Road).While it could well be years into the future, it would not be surprising that this <br /> parcel may end up being service or commercial orientated. Would we want such traffic going <br /> through this residential neighborhood? <br /> Finally, related to our above comments on a bigger picture look,there is a driveway(I would submit <br /> it is a fairly substantial corridor) adjacent to the east side of this Sketch Plan parcel (0605)that serves <br /> the large parcel (0604)to the east and south of this Sketch Plan parcel.We understand that the <br /> Sketch Plan parcel owner does not control this 0604 larger parcel. But, it is not unusual that such <br /> driveways (for the 0604 parcel) are proposed as a ROW corridor when such larger parcels get <br /> subdivided in the future.Again,we know this is a lot of forecasting, but, if it would play out this way, <br /> the proposed Lots 1, 2,and 3 would have a street on both the front and back of their lots. Definitely <br /> not efficient or what anyone would want to see. <br /> Access/Driveways: <br /> It is still early at a Sketch Plan stage to make comments. However, driveways onto a City street <br /> should not be an issue(and as long as the driveways for Lots 1 and 8 were back from CSAH 11). <br /> ++++++++ <br /> Justin (or Rich or Jenny),if you have any questions on the above,do not hesitate to let me know. <br /> I/we can attend the Monday, May 22 Planning&Zoning Commission 6 pm meeting if you would <br /> like.Just let me know. <br /> Thank you, <br /> Tim Houle,PE <br /> Civil Engineer,VP <br /> 218-316-3646 <br /> 7804 Industrial Park Road <br /> Baxter,MN 56425 <br /> W I DS E T H <br /> Widseth.com <br /> File Transfer I Click here to transfer large files <br /> 50 Best Places to Work (Prairie Business Magazine, 2022) <br /> From:Justin Burslie<Justin.Burslie@sourcewell-mn.gov> <br /> Sent:Tuesday, May 9,2023 2:21 PM <br /> To:Tim Houle<Tim.M.Houle@widseth.com> <br /> Cc: Richard Spiczka<rspiczka@pequotlakes-mn.gov>;Jenny Peterson<jpeterson@pequotlakes- <br /> mn.gov> <br /> Subject: Pequot Sketch Plan <br />