My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 Fee Schedule - Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2023
>
April 24, 2023
>
5.3 Fee Schedule - Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 2:37:18 PM
Creation date
4/17/2023 2:37:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fifty Lakes Planning and Zoning <br /> 2023 Fee Schedule <br /> Adopted January io, 2023 <br /> RESIDENTI_Aj <br /> *New Construction: <br /> Residential up to 1,000 sf Ground Cover $250.00 <br /> 1,001 sf to 2,000 sf Ground Cover $350.00 <br /> 2,001 sf to 3,000 sf Ground Cover $450.00 <br /> 3,001 sf to 4,000 Ground Cover $550.00 <br /> 4,001 or greater Ground Cover $650.00 <br /> Sewage Treatment System $250.00 <br /> *Additions/Replacements to existing Structure/Accessory Structures <br /> Residential Accessory Structure or Addition <br /> Less than too sf Ground Cover $75.00 <br /> 100 sf to 400 sf Ground Cover $100.00 <br /> 401 sf to 60o sf Ground Cover $150.00 <br /> 601 sf to 2,000 sf Ground Cover $200.00 <br /> 2,001 sf or greater Ground Cover $300.00 <br /> +Additions with no related Ground Cover-1/2 the standard Ground Cover fee <br /> COMMERCIAL <br /> *New Construction <br /> Up to 1,00o sf Ground Cover $375.00 <br /> 1,001 to 2,000 sf Ground Cover $475.00 <br /> 2,001 to 10,000 sf Ground Cover $575.00 <br /> 10,001 sf&greater Ground Cover $775.00 <br /> Commercial Storage Building(no Sewer or Water) $350.00 <br /> Sewage Treatment Systems $350.00 <br /> *Commercial Accessory Structures or Additions <br /> Up to 1,00o sf Ground Cover $275.00 <br /> 1,001 to 2,000 sf Ground Cover $375.00 <br /> 2,001 to 10,000 sf Ground Cover $475.00 <br /> Over 10,00o sf Ground Cover $675.00 <br /> +Additions with no related Ground Cover- 1/2 the standard Ground Cover fee <br /> Land Use Applications <br /> *Variance $450.00 <br /> *Conditional Use $450.00 <br /> *Interim Use $450.00 <br /> *Rezoning $450.00 <br /> *Subdivision by Metes&Bounds $350.00 <br /> *Lot Line Adjustment $100.00 <br /> *Preliminary Plat $500.00 + $25 per parcel <br /> *Final Plat $400.00 + $25 per parcel <br /> *Additional information gathering,review and inspection fees may be assessed. <br /> OTHER <br /> Address Assignment(County) $100.00 <br /> Dirt Moving Permit $50.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.