My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8. P & Z Administrator's Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2023
>
March 27, 2023
>
8. P & Z Administrator's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2023 11:56:47 AM
Creation date
3/10/2023 11:56:47 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 19, 2023 <br /> Daniel&Lauri Helbling <br /> PO Box 488 <br /> Pequot Lakes, MN 56472 <br /> RE: City of Pequot Lakes <br /> Potential City Code Violation <br /> PIN: 29250509 <br /> 5850 Little Walnut Ln <br /> Dear Mr. and Mrs. Helbling: <br /> It has come to my attention that you have added an 14X25 addition to your home and a <br /> Land Use Permit was not applied for nor issued. Please complete the enclosed Land Use <br /> Permit and return to City Hall with a detailed site plan and a current Compliance <br /> Inspection on your septic system. I am enclosing a list of septic professionals to contact <br /> an Inspector from the list or another licensed inspector of your choice. <br /> Section 17-11.8 LAND USE PERMITS <br /> 1. Land Use Permits shall be issued for all new structures and any change in <br /> structure exterior,plumbing or number of bedrooms, any construction or <br /> repair of a sewage system and any grading and filling in shoreland not <br /> exempted by this ordinance. No person shall assemble,install, repair, remodel, <br /> remove or construct any structure prior to applying for and receiving a Land <br /> Use Permit. <br /> Section 17-11.10 FEES <br /> The Council shall adopt a schedule of fees from time to time for all permits.No permit <br /> shall be issued, or request brought before the Board of Adjustment or Planning <br /> Commission until the fees are paid.All late applications shall require the payment of an <br /> after-the fact fee as outlined in the fee schedule. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.