Laserfiche WebLink
GD Riparian Only �,Non-Riparianc7 NE Lake <br /> Flag Pole Height—feet,maximum 30 30 30 <br /> Building above highest known groundwater or 3 3 3 <br /> lake level—feet,minimum <br /> Maximum Density 1 unit/20,000 sq.ft. 1 unit/40,000 sq.ft. 1 unit/80,000 sq.ft. <br /> ISTS setback from OHW—feet,minimum 75 75 100 <br /> 4. Performance Standards. The following performance standards apply to all <br /> development in this zone: <br /> A. Guest Quarters. A dwelling guest quarters must meet the <br /> following restrictions: <br /> (1) Shall be located along with the principal structure on the <br /> smallest lot meeting the above requirements. <br /> (2) Shall not cover more than 700 square feet of land and must <br /> not exceed 15 foot height. <br /> (3) Shall be located to reduce its visibility as viewed from <br /> public waters and adjacent shorelands. <br /> (4) Shall be screened from adjacent parcels and public waters <br /> by vegetation,topographical location, increased setback, <br /> color or other methods assuming summer leaf on <br /> conditions. <br /> B. Impervious Coverage. Impervious coverage may be increased by <br /> 5%through a conditional use permit if the following is provided: <br /> (1) A storm water retention plan showing containment of the 5- <br /> year,24-hour storm event on the parcel. <br /> (2) Direct runoff of stormwater to adjacent water bodies, <br /> including wetlands and adjacent parcels, shall be eliminated <br /> through the use of berms or other permanent means. <br /> C. Setback from OHW. On parcels with municipal sanitary sewer <br /> service,if a structure exists on either side of a proposed structure, <br /> the waterfront setback may be altered without variance to conform <br /> to the adjoining setbacks provided that the building site is not in a <br /> bluff impact zone or the setback less than 50 feet minimum. If no <br /> structure exists on either side, a new structure may encroach up to <br /> a 50-foot setback from the OHW. <br /> Pequot Lakes Staff Report 5.1-3 <br /> October 24,2022 <br />