My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.5 Road Project Updates
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2022
>
10-03-2022 City Council Meeting
>
9.5 Road Project Updates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2022 4:07:21 PM
Creation date
9/28/2022 4:07:21 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MDERSOAnderson Brothers Construction Company <br /> 11325 State Highway 210 <br /> BROTHE , /1 Brainerd, MN 56401 <br /> 218-829-1768 <br /> Since 1940 218-829-7607 Fax <br /> To: City Of Pequot Lakes Contact Nick Roy <br /> Address: 4638 County Road 11 Phone: 218-839-1799 <br /> Pequot Lakes,MN 56472 Fax: 218-568-5860 <br /> Project Name: McGill ST. Bid Number: <br /> Project Location: McGill Street Bid Date: 7/13/2022 <br /> Item# Item Description <br /> 2021.501 Mobilization <br /> 2211.501 Aggregate Base Class 5 <br /> 2360.501 Bituminous Wear Course <br /> 2221.501 Shouldering Topsoil <br /> Total Bid Price: $16,175.00 <br /> Notes: <br /> We are pleased to quote the following on the above-referenced project. <br /> • Anderson Brothers Construction is an Equal Opportunity Employer. <br /> • The shaping of existing soils being 160 Ln.ft.x 22'wide <br /> • The placing of 4"compacted dass-5 over a area being 160 Ln.ft.x 22 ft.wide <br /> • The paving of a 2-1/2"compacted Bituminous wear course being 160 ft.x 20 ft.wide Tying into east and west blacktop roadways. <br /> • The placing of a lft topsoil shoulder sloping into adjoining yard.No seeding or turf establishment induded. <br /> PRE-LIEN NOTICE:OWNER UNDERSTANDS THAT CONTRACTOR IS REQUIRED BY LAW TO PROVIDE OWNER <br /> WITH THIS NOTICE.(a)ANY PERSON OR COMPANY SUPPLYING LABOR OR MATERIALS FOR THE <br /> IMPROVEMENT TO YOUR PROPERTY MAY FILE A LIEN AGAINST YOUR PROPERTY IF THAT PERSON OR <br /> COMPANY IS NOT PAID FOR THE CONTRIBUTION.(b)UNDER MINNESOTA LAW,YOU HAVE THE RIGHT TO <br /> PAY PERSONS WHO SUPPLIED LABOR OR MATERIALS FOR THIS IMPROVEMENT DIRECTLY AND DEDUCT <br /> THIS AMOUNT FROM OUR CONTRACT PRICE,OR WITHHOLD THE AMOUNTS DUE THEM FROM US UNTIL <br /> 120 DAYS AFTER COMPLETION OF THE IMPROVEMENT UNLESS WE GIVE YOU A LIEN WAIVER SIGNED BY <br /> PERSONS WHO SUPPLIED ANY LABOR OR MATERIALS FOR THE IMPROVEMENT WHO GAVE YOU TIMELY <br /> NOTICE. <br /> ACCEPTED: CONFIRMED: <br /> The above prices,specifications and conditions are satisfactory Anderson Brothers Construction Company Of Brainerd,LLC <br /> and hereby accepted. <br /> Buyer: <br /> Signature: Authorized Signature: s e FA414///844 <br /> Date of Acceptance: Estimator: Scott Hendrickson <br /> 218-820-9917 <br /> shendrickson@andersonbrothers.com <br /> 7/13/2022 4:06:01 PM Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.