My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 SCDP Application - Force Main Project
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2022
>
10-03-2022 City Council Meeting
>
5.2 SCDP Application - Force Main Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2022 4:00:27 PM
Creation date
9/28/2022 4:00:20 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
111 EMPLOYMENT AND <br /> ECONOMIC DEVELOPMENT <br /> 2022 Small Cities Development Program Application <br /> Applicant: City of Pequot Lakes <br /> Author: Gail Leverson, MBA <br /> (Widseth) <br /> SCDP Amount Requested $600,000 <br /> Amount of Other Funds $3,040,000 <br /> SCDP Program Income $0 <br /> Estimated Total Project Cost $3,640,000 <br /> Application Description: <br /> Brief Description of the Preliminary Proposal: <br /> The City of Pequot Lakes has an emerging and critical need for a comprehensive wastewater improvement project. <br /> The aging system has had two critical breaks in their main forcemain-in October 2021 and February 2022.The City is <br /> respectfully requesting$600,000 of Small Cities Development Program(SCDP)funding to use with Public Facilities <br /> Authority(PFA)funding to complete this project in 2023.The total project cost of the project is$3,620,000.This <br /> project will meet the federal objective,as Pequot Lakes has been determined to be 52.66%low to moderate income, <br /> (2019,Housing and Urban Development(HUD)). <br /> The comprehensive wastewater project includes rehabilitation of the main lift station;removal,and replacement of <br /> the main forcemain;and construction of a stabilization cell.SCDP funding will be specifically used to completely <br /> replace 4,500 feet of forcemain that runs from the main lift station to the aerated stabilization ponds. It would be <br /> replaced with 6"high density polyethylene(HDPE)pipe that is flexible and strong,decreasing the risk of breaks. The <br /> rehabilitation of critical infrastructure will remove the health and safety hazards and possible contamination of <br /> groundwater.This project will specifically benefit the 2,318 City residents,who are 52.66%LMI and it is ready for <br /> construction in 2023 and 2024.Thank you for your kind consideration of this request. <br /> By signing above,the Applicant certifies to the best of their knowledge that the data and information provided in the <br /> Application is true and correct. <br /> Signature of Authorized Official: Date: <br /> Page 1 of 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.