My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 Approval of August 18, 2022 P & Z Meeting Minutes
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2022
>
09-15-2022 Planning & Zoning Commission Meeting
>
8.1 Approval of August 18, 2022 P & Z Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 10:03:50 AM
Creation date
9/9/2022 10:03:48 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Architectural Standards: <br /> i. Wood construction; <br /> ii. Siding shall raateh be compatible with main dwelling; <br /> iii. Exterior color shall mbe compatible with main dwelling; <br /> iv. Shingles shall match main dwelling; <br /> v. Roof pitch shall <br /> vi. <br /> I. Shall not be allowed as a Short-term Rental Dwelling Unit; <br /> J. May be allowed as a long-term rental(define); <br /> • . . . . • . : . . :: : • . . . . . : . . . . . <br /> . . - •• - . - • • . . . ' - . ; Only one (i) unit can <br /> be rented as a long-term rental; <br /> L. Conversion of garage space to an ADU shall require replacement of the garage <br /> space. Space within a garage that exceeds what is necessary for two vehicles <br /> may be converted without replacement; <br /> M. Onsite parking shall be required for the occupants of the ADU; <br /> N. A stormwater management plan shall be required demonstrating how <br /> stormwater water will be maintained on parcel; <br /> O. A licensed Subsurface Sewage Treatment System (SSTS) Designer shall <br /> determine if the existing SSTS is sized correctly for the additional bedroom(s) <br /> in the ADU; <br /> P. Only one (i) Guest Cottage or ADU shall be allowed in the Shoreland Area. <br /> 6.2 Conditional Use Permits — Discussion <br /> Mr. Burslie explained the Staff Report. There was confusion regarding permitted uses <br /> and allowed uses. Staff will revise the draft Matrix for the September meeting and was <br /> directed to include a use for a sign printing shop or a printing use. Mr. Burslie stated <br /> the Planning Commission may be required to look at some type of cannabis use in the <br /> future. <br /> 7. Approval of Minutes <br /> 7.1 Approval of July 21, 2022 <br /> A motion was made by Planning Commission Member Ellering, seconded by <br /> Planning Commission Member E. Larson, to approve the July 21, 2022 <br /> Minutes. All members voted"aye". Motion carried. <br /> 8. P&Z Administrator's Report <br /> 8.1 Permits and Correspondence <br /> Bittner pointed out there were no Land Use Permits issued in July and the 13 letters <br /> sent. <br /> MINUTES 6 <br /> Pequot Lakes Planning Commission <br /> August 18, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.