Laserfiche WebLink
Street Maintenance Revenue: $6,262.83 <br /> Street Maintenance Cost: $131,950 <br /> Percent of Cost Covered by Adjacent Property Tax: 65% <br /> Walkability Score: Very Good <br /> Redevelopment Potential: High <br /> Reconstruction Considerations: <br /> • Paved multi-use trail on south side of street connecting to pedestrian crossing at roundabout. <br /> • Bury overhead lines. <br /> • Install uniform street lighting <br /> Incremental Repair <br /> • Maintain existing murals <br /> • Add pedestrian light at City Hall entrance. <br /> • Improve general maintenance of sidewalks <br /> • Add more Bobber Planters <br /> North Washington Avenue <br /> L <br /> 11„,,-J . .tlI <br /> • n,. r.,;tt,teo <br /> - <br /> 4 S . <br /> 3 <br /> ' 1 .do 010 <br /> tiVii , <br /> .d <br /> 1 <br /> `r <br /> olio <br /> ,, X11 , J,k 9 <br /> is <br /> • ',, =--r-_12,111k,-- -a\ <br /> I ...}I1t II111 � <br /> -41 <br /> Neighborhood Composition <br /> Pequot Lakes Downtown Plan— Updated July, 2022 21 <br />