My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4 Consider Adoption of Downtown Plan Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2022
>
07-05-2022 City Council Meeting
>
6.4 Consider Adoption of Downtown Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 3:53:15 PM
Creation date
6/30/2022 3:53:10 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Front Street ,Hr, , <br /> "4\ \ <br /> ti <br /> s <br /> 1, <br /> ,„ , II,.f\ <br /> �, 1 <br /> Jas } ` ' \ <br /> • � , .. <br /> N , , ,i. e lor <br /> i� V <br /> •w" • c <br /> Wiwi ' <br /> �: <br /> , • <br /> � �l+ <br /> .ff <br /> -1 ,__4Qwer_Sy...*! a <br /> am/ <br /> T <br /> )' ' i' <br /> 1, _ _. • NV'', <br /> `wr 1 '� � 1 ryla <br /> ti i f 1 _ - 47-- I \ - ' 4 - <br /> Neighborhood Composition <br /> Front Street runs north and south between Patriot Avenue and Main Street and consists of commercial <br /> businesses on both sides of the street. The businesses located on the west side of the street are <br /> arranged in a pedestrian-friendly fashion while the placement of the structures on the east side of the <br /> street is predominately designed for automobiles. The southern end of the street's view terminates at <br /> the TDS building and the north view terminates with the highway. Front Street has a very high <br /> redevelopment potential and is critical to the overall success of the Grow Zone. <br /> Utility Overview <br /> • City Sanitary Sewer <br /> • City Water <br /> • Storm sewer <br /> Street Maintenance Revenue: $3,262.08 <br /> Street Maintenance Cost: $52,600 <br /> Percent of Cost Covered by Adjacent Property Tax: 84% <br /> Pequot Lakes Downtown Plan—Updated July, 2022 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.