My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.3 9th Avenue
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2022
>
06-07-2022 City Council Meeting
>
9.3 9th Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:42:08 PM
Creation date
6/2/2022 3:42:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Anderson Brothers Construction Company <br /> RMDEZSt <br /> 11325 State Highway 210 <br /> BROTHE ,/ Brainerd, MN 56401 <br /> 218-829-1768 <br /> S /9 (2 218-829-7607 Fax <br /> To: City Of Pequot Contact: Nick <br /> Address: 4638 County Road 11 Phone: 218-568-5222 <br /> Pequot Lakes,MN 56472 CROW WING Fac 218-568-5860 <br /> Project Name: 2022 9th Ave Road Improvements Bid Number: <br /> Project Location: 9th Ave. Bid Date: 5/10/2022 <br /> Item# Item Description Estimated Quantity Unit <br /> 9th Ave From 114 To 371 <br /> 2021.501 Mobilization 1.00 LS <br /> 2112.502 Sub Grade Prep 56.00 ST <br /> 2211.501 Aggregate Base Class 5 3,630.00 TON <br /> 2360.501 Bituminous Wear Course 2,156.00 TON <br /> 2221.501 Aggregate Shouldering Class 1 431.00 TON <br /> Total Price for above 9th Ave From 114 To 371 Items: $289,532.50 <br /> 9th Ave From 114 To Krist Ct <br /> 2021.501 Mobilization 1.00 LS <br /> 2112.502 Sub Grade Prep 3.00 ST <br /> 2211.501 Aggregate Base Class 5 195.00 TON <br /> 2360.501 Bituminous Wear Course 115.00 TON <br /> 2221.501 Aggregate Shouldering Class 1 25.00 TON <br /> Total Price for above 9th Ave From 114 To Krist Ct Items: $20,019.50 <br /> Total Bid Price: $309,552.00 <br /> Notes: <br /> • We are pleased to quote the following on the above-referenced project. <br /> • Anderson Brothers Construction is an Equal Opportunity Employer. <br /> • 9th Ave From 114 To Krist Ct: <br /> • The shaping of existing roadway being approximately 300 Ln.ft.x 26' <br /> • The placing of 4"compacted dass-5 to 26ft wide <br /> • The paving of a 2-1/2"compacted bituminous roadway starting at 114 going north to Krist CT being approximately 300 Ln.ft.x 24' <br /> • The pladng of a 1'wide Aggregate shoulder next to newly paved surface. <br /> • 9th Ave From 114 To 371: <br /> • The shaping of existing roadway from cr 114 to 371 being approximately 5600 Ln.ft.x 26(road is narrow in spots) <br /> • The placing of 4"compacted supplemental class-5 to 26ft wide <br /> • The placing of a 2-1/2"compacted bituminous roadway being approximately 5600 Ln.ft.x 24'wide <br /> • The placing of a 1'wide aggregate shoulder next to newly paved roadway <br /> 5/16/2022 5:03:28 PM Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.