Laserfiche WebLink
AGENDA ITEM # 9.1 <br /> City of <br /> Pequot <br /> Lakes <br /> REPORT TO CITY COUNCIL <br /> Report Prepared by: Rich Spiczka <br /> Date: April 5th, 2022 <br /> Subiect: Public Works Report <br /> Report: Summary of events this month in Public Works. <br /> -Book Drop was installed at Library. <br /> -All Signs in Trailside Park and Cole Building were taken down, <br /> repainted, stained and reinstalled. <br /> -Gate for Sibley Lake access was closed for the season. <br /> -Filling springtime Potholes has begun. <br /> -Pumped water at Brown St and Front St due to a frozen storm pipe. <br /> - Frozen storm pipes were thawed with jetter throughout city. <br /> - Springtime street sweeping on selected streets has been scheduled <br /> - There were 2 plowing events. <br /> - Snow hauled from behind Joes Pizza - minimize basement flooding. <br /> - Road weight restriction signs were installed. <br /> - Monthly building checks <br /> - Weekly Building cleaning and maintenance <br /> 08 Ford pickup is ready to be sold or repurposed. <br /> Council Action Requested: No council action requested. <br />