My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 Sketch Plan Review for The Preserve at Pequot Lakes - Premier Homes Inc
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2022
>
03-17-2022 Planning & Zoning Commission Meeting
>
5.3 Sketch Plan Review for The Preserve at Pequot Lakes - Premier Homes Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2022 2:05:39 PM
Creation date
3/9/2022 2:05:37 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
velocities, erosion potential, and reduce and delay runoff <br /> volumes. Erosion prevention and sediment control practices <br /> must be used to retain sediment on site. Disturbed soil areas <br /> must be stabilized and protected as soon as possible. The <br /> maximum time the soil in a project area can remain <br /> exposed when the area is not actively being worked is 3 <br /> days. Temporary or permanent cover for the exposed areas <br /> is required at that time but should be installed sooner if <br /> possible. All deltas and sediment deposited in surface <br /> waters,including drainage ways, catch basins, and other <br /> drainage systems must be removed within 14 days unless <br /> precluded by legal,regulatory, or physical access restraints. <br /> The areas where sediment removal results in exposed soil <br /> must be stabilized within 7 days after completing the <br /> removal. <br /> (3) To the maximum extent possible, land-disturbing activities <br /> must not occur within the shore impact zone. <br /> Pequot Lakes Staff Report 5.3-7 <br /> March 17,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.