Laserfiche WebLink
W i DSETH <br /> 2022 FEE SCHEDULE <br /> CLASSIFICATION RATE <br /> Engineer/Architect/Surveyor/Scientist/Wetland Specialist/Geographer <br /> Level I $125/Hour <br /> Level II $148/Hour <br /> Level III $172/Hour <br /> Level IV $180/Hour <br /> LevelV $195/Hour <br /> Technician <br /> Level I $82/Hour <br /> Level II $105/Hour <br /> Level Ill $122/Hour <br /> Level IV $137/Hour <br /> LevelV $153/Hour <br /> Computer Systems Specialist $175/Hour <br /> Senior Funding Specialist $130/Hour <br /> Marketing Specialist $120/Hour <br /> Funding Specialist $100/Hour <br /> Administrative Assistant $75/Hour <br /> OTHER EXPENSES - ..,... RATE <br /> Mileage(Federal Standard Rate)subject to IRS Guidelines <br /> Meals/Lodging Cost <br /> Stakes&Expendable Materials Cost <br /> ATV 4-Wheeler Rental $100/Day <br /> ATV Side by Side Rental $200/Day <br /> Waste Water Sampler $40/Day <br /> ISCO Flow Recorder $60/Day <br /> Photoionization Detection Meter $80/Day <br /> Explosimeter $50/Day <br /> Product Recovery Equipment $35/Day <br /> Survey-Grade GPS(Global Positioning System) $75/Hour <br /> Mapping GPS(Global Positioning System) $150/Day <br /> Lath&Hubs $150/Day <br /> Soil Drilling Rig $35/Hour <br /> Groundwater Sampling Equipment $75/Day <br /> Subcontractors Cost plus 10% <br /> REPRODUCTION COSTS <br /> Black&White Copies:8-1/2"x 11" $0.10 Each <br /> Black&White Copies:11"x 17" $0.50 Each <br /> Black&White Copies:24"x 36" $3 Each <br /> Color Copies:8-1/2"x 11" $2 Each <br /> Color Copies:11"x 17" $4 Each <br /> Color Copies:24"x 36° $12 Each <br /> Color Plots:42"x 48" 22 Each <br /> -t:„ These rates are effective for only the year indicated and are subject to yearly <br /> MILadjustments which reflect equitable changes in the various components._ �, � <br />