My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.01 - Planning Commission Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2014
>
05-06-2014 Council Meeting
>
06.01 - Planning Commission Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2014 11:39:28 AM
Creation date
8/29/2014 11:22:56 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Have applicant or surveyor determine impervious surface coverage of the two new <br />lots. (New i & 2) (Lot 3). <br />6. The existing retaining wall will remain in its current location and will not be <br />modified. <br />All members voted "aye". Motion carried. <br />Chair Seils closed the Public Hearing. <br />ADDITIONS OR DELETIONS TO AGENDA: None. <br />OPEN FORIJM: None. <br />NEW BUSINESS: None. <br />OLD BUSINESS: None. <br />APPROVAL OF MINUTES: <br />Chair Seils pointed out the letter on the table from Tom Steffens concerning the <br />conditions included in the draft Minutes of the March 20, 2014 meeting. Mr. Burslie <br />stated that the Minutes can be edited if incorrect. <br />Mr. Burslie further stated he remembers discussing them, even if only briefly. They <br />were read into the record. Mr. Steffens had a copy of the Staff Report and knew the <br />conditions were included. <br />Planning Commission Member Hallan stated a lighting plan is necessary. The condition <br />has been included in the Staff Report each month. As the applicant proceeds the City <br />will need the lighting plan. Mr. Surslie stated a lighting plan needs to indicate the <br />neighbors will not be impacted. <br />Planning Commission Member Oraskovich stated the conditions were read during the <br />meeting. <br />Council Member Gardner asked about Condition 24. Mr. Burslie stated the storm water <br />management plan was submitted as part of their Preliminary Plat application, which <br />was received after the March 2o meeting. <br />Minutes <br />Pequot Lakes Planning Commission <br />April 17, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.