My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.01 - Planning Commission Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2014
>
05-06-2014 Council Meeting
>
06.01 - Planning Commission Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2014 11:39:28 AM
Creation date
8/29/2014 11:22:56 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The meeting was called to order by Chair Seils at �:02 p.m. <br />Chair Seils opened the Public Hearing. <br />PUBLIC HEARING: <br />APPLICANT: Blaine and Lee Jones <br />Applicant requests a Variance to Expand a Non-Conforming Structure <br />Applicant was present. Mr. Burslie explained the Staff Report. Staff recommends the <br />application be approved with 5listed conditions. <br />Mr. Jones questioned the size of the deck as listed in the Staff Report. Mr. Burslie stated <br />the survey indicates 14 feet, but the proposed first floor plan indicates 15.5'. Mr. Jones <br />stated the correct measurement would be i5.5 feet. <br />Mr. Jones clarified Condition Number Five and asked what would happen if the <br />impervious surface exceeds 20%. Mr. Burslie stated this Variance would be reopened, <br />but feels it will be under 20%. <br />Mr. Jones asked if he needed to combine all three lots. Mr. Burslie stated he has the <br />right to keep Lot 3 separate. <br />Planning Commission Member Hallan pointed out the two wells indicated on the survey. <br />Mr. Jones stated the well for the cabin serves the whole property. The second one may <br />not operate and be only for decorative purposes. Planning Commission Member Hallan <br />further stated that the SSTS for the guest cabin is hooked into the main SSTS. If Lot 3 is <br />sold separately, it may be difficult to fit a new SSTS on Lot 3. <br />No public comment. <br />Planning Commission Member Hallan asked if Mr. Jones planned to modify the existing <br />retaining wall. Mr. Jones stated he does not plan to modify the retaining wall. Planning <br />Commission Member Hallan stated there will be excavation in a bluff and added <br />Condition Number Six: The existing retaining wall will remain in its current location and <br />will not be modified. <br />Planning Commission Member Brown asked how high the building will be. Planning <br />Commission Member Hallan stated 23.8 feet, well below the ordinance. <br />Planning Commission Member Oraskovich thanked the applicant for providing complete <br />information. <br />Minutes <br />Pequot Lakes Planning Commission <br />April 17, 2014 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.