Laserfiche WebLink
HURTIG ROAD <br />Pequot Lakes City ............................. Summer and Winter Maintenance <br />69' STREET & 11' AVENUE <br />Pequot Lakes City ............................ Summer and Winter Maintenance <br />NORTH SLUETTER ROAD <br />Odd Years (2011, 2013) <br />Pequot Lakes City ............................ Winter Maintenance <br />Loon Lake Township ........................ Summer Maintenance <br />Even Years (2010, 2012, 2014) <br />Loon Lake Township ........................ Winter Maintenance <br />Pequot Lakes City ............................ Summer Maintenance <br />SIBLEY LAKE ROAD <br />Loon Lake Township ........................ Summer Maintenance <br />Pequot Lakes City ............................. Winter Maintenance <br />MAINTENANCE RESPONSIBILITIES <br />1. Winter Maintenance: Plowing and sanding <br />2. Summer Maintenance: Grading, mowing, crack - filling, and pot holes <br />3. Materials: Materials put on line roads will be a cost -share project. Any <br />materials put on a line -share road must be done with the approval of both the City <br />Council and the Township Board. If approval is not given, cost -share materials <br />can be denied. <br />4. Repairs: Road surface and shoulders will be done by joint agreement for <br />entire roadway with costs split in proportion to road ownership. <br />5. Tree Removal: Removing trees from the road right -of -way as needed to <br />avoid interference with travel, maintenance, or safety will be the responsibility of <br />the city who owns the road on that portion in which the trees are located. <br />