Laserfiche WebLink
Page 8 of 19 <br /> <br />linework, and layers. Additionally, the collected raw data shall be provided to the <br />City/Township Coalition upon request. <br /> <br />2.1.7. Wetland Delineation <br /> The Consultant shall complete a wetland delineation within the project area and <br />prepare a wetland delineation report based on the identified areas. The delineation <br />report shall include wetland type, distinct locations, and the existing plant <br />communities. At least 1 Technical Evaluation Panel (TEP) meeting shall be attended <br />by the Consultant to introduce the project, discuss potential wetland impacts, and <br />alter the report according to the TEP recommendations. Minutes of all such <br />meetings with the TEP shall be kept by the Consultant and shall become part of the <br />permanent project records, being transferred to City/Township Coalition. All <br />identified wetland areas shall be surveyed and displayed in the topographic base <br />map drawing. <br /> <br />2.1.8. Geotechnical and Environmental Exploration <br /> Upon authorization from the City/Township Coalition, the Consultant will have <br />the opportunity to perform limited geotechnical exploration in select areas. These <br />areas may be anticipated muck locations, pond locations, road realignments, or areas <br />of concern based on the Consultants recommendations. A detailed geotechnical <br />evaluation will be performed in Phase 2 of this RFP. <br /> <br />The Consultant shall perform a cursory review of the cultural resources and or <br />historic properties that may affect the proposed layout of this corridor. Any <br />preliminary findings shall be discussed with the City/Township Coalition <br />immediately upon discovery. If deemed necessary, further environmental review <br />and documentation will be addressed in Phase 2 of this RFP. <br /> <br />2.1.9. Public Land Survey and Existing Property Lines <br /> The Consultant will locate all public land survey corners and boundary corners <br />necessary to complete a detail parcel breakdown of the project area. The parcel <br />breakdown map shall be approved by a Land Surveyor licensed by the State of <br />Minnesota and should be presented in a drawing format, as specified in Section 2 of <br />this document. Drawing items should include, but not be limited to the following <br />features: <br />x Clearly defined linework of all parcels and right of way lines affected by the <br />project. <br />x Public land survey corners and boundary corners should be identified using <br />standard symbols to differentiate points. All found monuments shall be <br />identified as to the type and size of monument, and identified as such in the <br />ACAD drawing.