Laserfiche WebLink
Page 2 of 19 <br /> <br />PROJECT INFORMATION <br /> <br />1.1. Project Overview <br />The Cooperative Community Enhancement Project is a City/Township Coalition <br />consisting of Pequot Lakes, Breezy Point, Jenkins Township and Ideal Township is <br />issuing a request for proposals (RFP) to provide project coordination, stakeholder <br />engagement, preliminary highway survey and design, cost estimating and alternative <br />development for future roadway improvements to Buschmann Road, Akerson Road, <br />Nelson Road and Wild Acres Road improvement project. <br /> <br />1.2. Project Background and Need <br />This network of roads consists of several rural local roads from multiple jurisdictions <br />located in North-Central Crow Wing County, consisting of a combination of: Akerson <br />Road, Nelson Road, Wild Acres Road, and Buschmann Road. The jurisdictions involved <br />include Jenkins Township, Ideal Township, The City of Pequot Lakes, and the City of <br />Breezy Point. <br />For years the constituent jurisdictions have discussed various issues associated with this <br />network of roads. The issues identified include high volumes of truck traffic from area <br />gravel pits, inconsistent traffic speeds, steep grades, blind approaches, deteriorating <br />structural and surface conditions. Increasing costs for annual summer maintenance and <br />affective snow plowing operation have also been identified as challenges. <br />The network’s increasing use as a convenient connection between County State Aid <br />Highway (CSAH) 11 and CSAH 16 and the Trunk Highway (TH) 371 have initiated <br />discussions with Crow Wing County to accept future jurisdiction of these roads. The <br />County has indicated that the roads would have to meet appropriate State Aid roadway <br />design standards before consideration is given to accepting jurisdiction. The County has <br />also indicated the it will not a accept a roadway that does not make a complete <br />connection between two other County roadways. <br /> <br />1.3. Project Goals and Objectives <br />The objectives for this project can be summarized in three phases, which closely follow <br />the deliverables in section 2 of this document. The main objective in phase 1 is to <br />provide community leaders with information related to project feasibility. Preliminary <br />cost estimates, funding sources, design alternatives, and project outcomes will all be key <br />components for identifying the scope of this project. Phase 2 can be described as the <br />development of a preferred geometric design that balances the needs of the Community, <br />City/Township Coalition, the Traveling Public, and the property owners along the <br />roadway. While the objective of Phase 3 is to provide contract administration and project <br />management throughout the construction stage of this project. Consistent with all <br />transportation projects, our primary objectives are to address safety, traffic, access