My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1D CUP - Geotechnical Explorations Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2021
>
01-21-2021 Planning & Zoning Commission Meeting
>
4.1D CUP - Geotechnical Explorations Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2021 12:18:29 PM
Creation date
1/15/2021 12:18:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDEPENDENT TESTING TECHNOLOGIES, INC. LOG OF SOIL BORING <br /> PROIECT 18-412 WSN DATE.• 10 4 18 BORIN6#: SB-4 <br /> SHOVEL READY PR07ECT SITE START TIME.•10:30 END TIME.• 10:50 <br /> PEQUOT LAKES,MINNESOTA <br /> METHOD: 3 �/a"I.D. Hollow Stem Auaer <br /> CREW.• CD <br /> LOCATION.� See Boring LocatYon Plan ELEI/ATION,• 1279.1 Page 1 of 1 <br /> D�i ASTM Soi Samp e N <br /> Feei') Symbo/ DesaJplfon # �a/ue W„ Notes <br /> SILTY SAND,fine to um grain , ar brown. <br /> 10" TOPSOIL 9.4 <br /> SM SILTY SAND,tine to me�ium grained,tra�of GRAVEL, <br /> brown. <br /> 4 0 2 3 8.9 <br /> SP POORLY ORADED SAND,flne to m�lium grained, <br /> 5.0 w/QRAVEL,brown. <br /> 3 1 s.9 <br /> 4 14 s.o <br /> 10.0 <br /> 5 10 �.8 <br /> � 6 : 13 3.6 <br /> Borirtg complaba to 14.9 feet. <br /> No water was enoountered during drllling. <br /> Water not pr�ent to�ve-in at 6'2"aRer drilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.