My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1D CUP - Geotechnical Explorations Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2021
>
01-21-2021 Planning & Zoning Commission Meeting
>
4.1D CUP - Geotechnical Explorations Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2021 12:18:29 PM
Creation date
1/15/2021 12:18:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 15,2018 <br /> Proje,ct 18-412 <br /> Shovel Ready Proj�t Site <br /> Pequot Lakes,Minuesota <br /> I.a�tion Recommended Compaction I.evet <br /> (percent of Std.Proctor ASTM D698) <br /> Below Foundetions 98°/a <br /> Below Slaba end�terior Well Backfill 98% <br /> Exterior Wall BackSll 95% <br /> Balow Pav�,deeper thau 3 feet fmm fmished subgrade 95% <br /> Below Pave�menffi withiu 3 feet of finished�tbgrade 100'/0 <br /> �� 90'/0 <br /> We recommend all fill placed in the building and pavement areas be compacted in 8-inch loose <br /> lifts. All fill should be compacted at a moisture content within plus or minus 3%of the optimum <br /> moisture as determined by a standard proctor. We recommend compaction tests be taken on any <br /> fill in the building and pavement azeas at a ra.te of one test per 2 vertical feet per 2,500 square <br /> foot azea,with a minimum of two tests per fill area. <br /> Foundat�ons: <br /> The N-values recorded in the penetration borings indicate that the existing native soils at <br /> anticipated foundation depth on this site are in a dense condition capable of supporting the <br /> anticipated structures placed on standard spread footings. For typical commercial buildings, <br /> spread footings should suffice. Further evaluation and analysis will be necessary for heavier or <br /> larger structures or equipment or machinery that has stricter requirements for vibration or <br /> settlement. All footings should be placed on native sands(SP, SP-SM, S1Vn or properly <br /> compacted structural fill. <br /> We recommend all exterior footings be placed at a minimum depth of 60 inches below proposed <br /> final grade to pmvide protection from frost damage. Interior footings in heated azeas can be <br /> placed at any convenient depth as long as they are on firm,native soils or properly compacted <br /> fill. In unheated azeas,we recommend the footings be placed 72 inches deep due to increased <br /> frost penetration depths in unheated areas. <br /> We recommend any foundations placed on native soils or on properly compacted fill should be <br /> proportioned for a maximum net allowable soil bearing pressure of 3000 psf. The recommended <br /> bearing pressure is a net value and represents the actual loads that may be transmitted to the soil <br /> independent of overburden pressures. , <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.