My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 Heart of the Good Life (HOTGL) Larsen Parkway Project Recommendation
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2021
>
01-05-2021 City Council Meeting
>
09.01 Heart of the Good Life (HOTGL) Larsen Parkway Project Recommendation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:09:42 PM
Creation date
12/31/2020 12:09:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W i DSETH <br /> December 29, 2020 <br /> Brainerd/Baxter <br /> 7804 Industrial Park Road <br /> Baxter MN 56425 <br /> Honorable Mayor and City Council 218.829.5117 <br /> City of Pequot Lakes BvcterC�?Widseth.com <br /> 4638 Main Street Widseth.com <br /> Pequot Lakes, MN 56472 <br /> RE: 2021 Larsen Parkway Street and Utilities Improvement Project <br /> Engineer's Letter of Recommendation for Bid Award <br /> Widseth No. 2020-11495 <br /> Dear Mayor and City Council: <br /> Pursuant to authority of the City Council and after proper legal advertisement, bids for the above <br /> referenced project were obtained at 10:00 a.m. in the Pequot Lakes City Hall on December 29, 2020. <br /> The following unit price bids were received: <br /> DeChantal Excavating, LLC $ 370,240.15 <br /> RL Larson Excavating, Inc. $ 398,795.24 <br /> Borden Excavating, Inc. $ 403,156.00 <br /> Landwehr Construction, Inc. $ 423,885.25 <br /> Anderson Brothers Construction Co. $ 468,137.35 <br /> Douglas-Kerr Underground LLC $ 479,153.29 <br /> Kuechle Underground Inc. $ 482,302.00 <br /> TNT Construction Group, LLC $ 484,000.00 <br /> J.R. Ferche Inc. $ 484,288.45 <br /> Casper Construction Inc. $ 549,500.00 <br /> Utility Systems ofAmerica, Inc. $ 571,784.50 <br /> Meyer Contracting $ 588,499.65 <br /> Larson Excavating Contractors, Inc. $ 616,081.04 <br /> Engineer's Estimate $ 476,532.25 <br /> Details of all bids are shown on the attached Tabulation of Bids(3 pages). The bids were conforming <br /> to the plans, specifications, and advertisement. <br /> We recommend that the Contract be awarded to DeChantal Excavating, LLC, the lowest responsive, <br /> responsible bidder, on the basis of the unit prices in the bid proposal. <br /> WIDSETH SMITH NOLTING <br /> / r ��.0 <br /> � �. ��� <br /> / <br /> Timothy M. Houle, P.E. <br /> Enc. Tabulation of Bids—3 pages <br /> c: Tony Pohl, Widseth <br /> Widseth File <br /> ARCHITECTS ■ ENGINEERS ■ SCIENTISTS ■ SURVEYORS <br />
The URL can be used to link to this page
Your browser does not support the video tag.