My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2021
>
01-05-2021 City Council Meeting
>
09 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:06:46 PM
Creation date
12/31/2020 12:06:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Deut. <br /> Facilitv Performance for November 2020: <br /> Flow <br /> Average daily gallons pumped: 102,000 gallons <br /> M�imum daily gallons pumped: 136,000 gallons <br /> Minimum daily gallons pumped: 65,000 gallons <br /> Total monthly gallons pumped: 2,959,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.36 (mg/1) <br /> *Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.62 (mg/1) <br /> *Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Deut. <br /> Facilitv Performance for November 2020: <br /> Flow <br /> Average Daily Flow: 64,415 gallons (Design— 121,795 gaUday) <br /> Maximum Daily Flow: 71,711 gallons <br /> Minimum Daily Flow: 55,479 gallons <br /> Total Monthly Flow: 1,932,453 gallons <br /> Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday,Wednesday, and <br /> Friday. <br /> 3) Monthly lift station maintenance(check amps, clean floats, inspect wet well, etc.)was <br /> completed on 12/16. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 12/22. <br /> 6) Monthly fluoride report was submitted to Minnesota Department of Health on 12/3. <br /> 7) Monthly Discharge Monitoring Report for the WWTP was submitted to MPCA on 12/2. <br /> 8) Quarterly Discharge Monitoring Report for the WTP was submitted to MPCA on 12/1. <br /> 9) A repair was made to the electrical panel at the Super Valu lift station. <br /> 10)Jake and I participated in a zoom meeting with Jason,his staff and a GIS specialist from <br /> Widseth. Weather permitting,we'll be putting the City's new gps handheld unit to use <br /> marking water/wastewater infrastructure points around town. <br /> Water/WW Portion Submitted by Andrew Schwartz, Operations Manager, Pine <br /> River Area Sanitary District. Please feel free to call his cell at 320-232-5787 with any <br /> questions/concerns for 24-hour emergency service ca11218-851-9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.