09.03 - Change Order #4-S Oak St Proj
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
10-06-2009 Council Meeting
>
09.03 - Change Order #4-S Oak St Proj
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 10:03:47 AM
Creation date
6/19/2014 10:01:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order <br />No. 4 <br />Date of Issuance: September 30, 2009 Effective Date: September 30, 2009 <br />Project: 2009 South Oak Street Owner. City of Pequot Lakes Owner's Contract No.: <br />Improvements <br />Contract: Street and Storm Drainage Improvements Date of Contract: <br />Contractor. DeChantal Excavating, LLC Engineer's Project No.: 0130BOG40 <br />The Contract Documents are modified as follows upon execution of this Change Order: <br />Description: <br />Adjustment of contract amount to reconcile estimated quantities with as -built quantities. <br />Attachments: None <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: <br />Original Contract Price: Original Contract Times: ❑ Working days X Calendar days <br />Substantial completion (date): July 31, 2009 <br />$_198.940.59 Ready for final payment (date): August 28. 2009 <br />\.. Increase from previously approved Change Orders Increase from previously approved Change Orders <br />No. 1 to No. 3 No. 1 to No. 3 <br />Substantial completion (date): August 21,2009 <br />$ 25.781.27 Ready for final payment (date): September 18, 2009 <br />OR <br />Contract Price prior to this Change Order. Contract Times prior to this Change Order. <br />Substantial completion (date): August 21. 2009 <br />$ 224.721.86 Ready for final payment (date): September 18, 2009 <br />Increase of this Change Order. Increase of this Change Order. <br />Substantial completion (date): NIA <br />$_ 25.448.63 Ready for final payment (date): N/A <br />Contract Price Incorporating this Change Order. Contract Times with all approved Change Orders: <br />Substantial completion (date): August 21. 2009 <br />$ 250,170.49 Ready for final payment (date): September 18. 2009 <br />RECOMMENDED/n ACCEPTED: ACCEPTED: <br />ay m: N By., BY: <br />Engineer ( Authorized Signature) Owner (Authorized Signature) Contractor (Authorized Signature) <br />r <br />Date: 1 701 u 09 Date: Date: <br />EJCDC No. C -941 (2002 Edition) Page 1 of 1 <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the <br />Associated General Contractors of America and the Construction Specifications Institute. 0130B0040 <br />