Laserfiche WebLink
CITY OF PEQUOT LAKES <br /> 2021 LAND USE FEE SCHEDULE <br /> Residential Construction* <br /> Main Floor asement not included in cost factor $.20 s . ft. <br /> Additional Floors includes basement&attached ara e $.10 s . ft. <br /> Accesso Buildin over 100 s . ft. &without lumbin $.15 s . ft. <br /> Accesso Buildin over 100 s . ft. &with lumbin $.20 s . ft. <br /> Accesso Buildin 100 s . ft. or less $50 min. fee does not a 1 <br /> Demolition $75 <br /> Minimum Permit Fee $125 <br /> Commercial Construction** <br /> Buildin without lumbin $.20 s . ft. <br /> Buildin with lumbin $.25 s . ft. <br /> Accesso Buildin (100 s . ft. or less $50 min. fee does not a 1 <br /> Paved Parkin Lots $100 <br /> Demolition $75 <br /> Minimum Permit Fee $125 <br /> Si a e <br /> Commercial,Permanent, and Offsite $100 <br /> Home Occu ation $50 <br /> Comxnercial Si Conc t Plan $100 <br /> Residential Si Conc t Plan $100 <br /> Hearin Fees <br /> Residential Conditional Use $350 Plus Recordin Fee- $46 <br /> Commercial Conditional Use $450 Plus Recordin Fee- $46 <br /> Residential Variance $350 Plus Recordin Fee- $46 <br /> Commercial Variance $450 Plus Recordin Fee- $46 <br /> Rezonin R uest $350 <br /> Petition for Ordinance Amendment $250 <br /> Subdivisions <br /> Sketch Plan Review $150 credited to relimin lat <br /> Prelimin Plat less than 141ots $600 <br /> Preliminary Plat(141ots or more) $3,000 Deposit(direct expenses <br /> invoiced and taken from d osit <br /> Final Plat $250 <br /> Metes and Bounds less than 10 acres er arcel $300 <br /> Metes and Bounds 10 acres or eater er arcel $50 <br /> Miscellaneous Fees <br /> Communication Towers 50 ft.— 1,000 ft. $500+CUP <br /> Communication Towers over 1,000 ft. $1,000+CUP <br /> Page 6 <br />