My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 - Planning & Zoning Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
09-01-2009 Council Meeting
>
06 - Planning & Zoning Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 11:49:21 AM
Creation date
6/18/2014 11:47:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
at a Conditional Use Permit in the Commercial zone and the Variances come into play <br />�... with the impervious coverage and screening requirements. <br />The Rezone is the first issue and we have tried to frame it in terms of the Comprehensive <br />Plan and the two different zones. Do we see the traditional grid style development <br />extending down to this site or do we see this site keep the highway orientation. Applicant <br />has done a lot to meet the Downtown Mixed Use requirements. By doing this, they are <br />committing the property to the north also, with interconnected properties. There will be <br />streets with on street parking and sidewalks. Access will be by car and by walking. <br />There will be a repeating grid from the north. Those things will not be done as part of <br />this project, but is a concept of rezoning, creating a pattern of development that would <br />reflect development patterns of the north. The Babinski property could at some point be <br />redeveloped in the same pattern. If this type of development is not the vision, then we <br />need to look at the Commercial zone. <br />Chairman Woog stated that while we are looking at rezoning these parcels, down the road <br />we need to look at the Church piece in between. We need to be sure it all makes sense. <br />Mr. Marohn explained that as part of the planning process the Future Land Use Map was <br />created. Planning is fairly easy with the map. When someone makes a request that is <br />inconsistent with the map, it forces us to do planning along with the zoning. This is not <br />consistent with the future plan. <br />Mr. Tucci stated it may be site specific vs. area specific. They have plans to connect with <br />a force main to the sanitary sewer on Olson Street. <br />Mr. Barrett stated they provided the best connectivity to the downtown from this location. <br />Until there is future development or future planning, this is the best way to do that. They <br />have used architecture resembling other establishments in the Downtown Mixed Use <br />zone such as stone and heavy timbers to bring down the size of the building and to add <br />character. <br />Chairman Woog explained that we will be taking questions and comments on the Rezone <br />request now and later for the Conditional Use Permit: <br />Public comment: <br />Jean Pollnow, 30662 Olson Street. Their home is behind Gloria Dei Church (old <br />parsonage). She wondered if the applicant has considered the impact to their home. The <br />retention pond will become a swamp. This will become a nightmare. There needs to be a <br />privacy fence all the way along their property. Their dining room faces the project. <br />Truck deliveries is a concern. A privacy fence is necessary. <br />Mr. Barrett stated that Olson Street will not be for truck delivery. The traffic plan for the <br />site is off the highway, around the building, and back out to the highway. Delivery hours <br />Minutes 6 <br />Pequot Lakes Planning Commission <br />August 20, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.