Laserfiche WebLink
Park Commission Minutes <br /> September 10, 2020 <br /> Page 2 <br /> ------------------------- <br /> Bittner reported Todd Knutson removed the picture that was not painted by a <br /> student August 31. <br /> Discussion ensued how to ensure waivers for new art are completed and <br /> returned to the City. Commissioner Churack volunteered to annually inventory <br /> the pictures and confirm the pictures are appropriate and waivers are completed <br /> and are on file at City Hall. <br /> 6. Liqhtinq of Betsv Ross Flaq <br /> Bittner explained the City had received a , , ����mplaints that the Betsy <br /> Ross Flag was not lit. After researching th�issue, i�.�s determined that this <br /> flag should be treated the same as the American Flag���e Betsy Ross Flag was <br /> part of the original request from the donor. The cost for�I��er flag pole is <br /> $2,000, plus installation. The asphalt and cement base wo��eed to be <br /> removed and replaced. Discussion ensued regarding lighting���he flag and it <br /> was the consensus lightin�g� should be the first step. If necessat�,#he pole can <br /> be replaced at a later dat� x� ; <br /> � �- _ ,.. <br /> It was the consensus of the I�[Ic G��i'�ission to inform the City Council that the <br /> City received 2 �omplaints, th�;Park Ca�i�t»ssion wasn't aware the Betsy Ross <br /> �d- <br /> Flag needed t��e�d like tfi+��mer�"�, and that the Park Commission <br /> is having th��� lit. <br /> 7. Bean Hole Feni�3�Art = <br /> �� <br /> Chair Rot�ning conta� the Schot�l reg�ing students providing art for the <br /> fence, as well�s the Pi�eball Coui�;,�nd was told at this point with the <br /> unknowns regarding COVtJ)-�9 and student attendance, the School is not <br /> int�rested in providir�g art fo��fence or proceeding with a Pickleball Court. <br /> Bittner st�ted someone should contact Katie at the Chamber and work with the <br /> Bean Hole Committee t4 see if they have any ideas for decorations. Chair <br /> Ronning volu�nteered tt��contact the Chamber. <br /> Commissioner Johnson stated the owner of Faith Boost had contacted Jason <br /> Gorr, Public Works Director, regarding providing art for the fence. <br /> Commissioner Boucher suggested staining the fence in the spring. If a section <br /> needs to be replaced in the future, the stain will match the new section. If <br /> allowed to gray, a new section would not match. <br /> 8. Citv Park Evaluations <br />