My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02A Rasmussen Road & South Washington Avenue Improvement Project - Partial Payment Estimate (Final)
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
10-06-2020 City Council Meeting
>
09.02A Rasmussen Road & South Washington Avenue Improvement Project - Partial Payment Estimate (Final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:59:30 PM
Creation date
10/1/2020 12:59:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM #9.2.A <br /> Cil�t Of <br /> Pequot <br /> Lal�es= : <br /> REPORT TO CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: October 6, 2020 <br /> Subiect: Rasmussen Road & South Washington Avenue Improvement Project <br /> — Partial Payment Estimate (Final) <br /> Re ort: The Construction Contract calls for payments to the Contractor, RL <br /> Larson Excavating, on a monthly basis. This Project is a unit price job where the <br /> Contractor provided unit prices for estimated quantities for different items of work. <br /> RL Larson Excavating has submitted quantities for the work performed in this <br /> Partial Payment Estimate (PPE) Number 5, which we have verified. <br /> All punch list items have been completed. We have sent out a Final Newsletter <br /> with our project engineer's phone number in case someone has a question or issue. <br /> The Contract has a 12-month Correction Period for the Contractor to come back <br /> and replace defective materials or workmanship. <br /> The Contractor has provided the required closeout documentation. This is the Final <br /> PPE. This PPE also releases the final retainage the City has been withholding. <br /> Due to some quantity overruns, the construction came in 1.5% ($35,330) over the <br /> Contract total. Overall, with all project costs — engineering, soil testing, easements, <br /> legal, and financing - the project is under the Bond amount. <br /> Council Action Requested: Council motion approving Partial Payment Estimate <br /> Number 5 (Final) to RL Larson Excavating Inc. in the amount of$172,948.05. <br />