My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03.06 - Change Order #3-S Oak St Improve
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
09-01-2009 Council Meeting
>
03.06 - Change Order #3-S Oak St Improve
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 11:48:13 AM
Creation date
6/18/2014 11:47:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order <br />No. 3 <br />Date of Issuance: August 25, 2009 Effective Date: August 25, 2009 <br />Project: 2009 South Oak Street er. City of Pequot Lakes Owner's Contract No.: <br />Improvements <br />Contract Street and Storm Drainage Improvements Date of Contract: <br />Contractor: DeChantal Excavating, LLC Engineer's Project No.: 0130B0040 <br />The Contract Documents are modified as follows upon execution of this Change Order: <br />Description: <br />Additional Agrilime necessary for completion of baseball field relocation ($4,602.75). <br />Relocation of baseball field irrigation system ($670.00). <br />Additional 6 -foot tall fence for baseball field requested by school district ($2,191.50). <br />Attachments: None <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: <br />Original Contract Price: Original Contract Times: ❑ Working days X Calendar days <br />Substantial completion (days or date): July 31. 2009 <br />$ 198.940.59 Ready for final payment (days or date): August 28. 2009 <br />Increase from previously approved Change Orders Increase from previously approved Change Orders <br />No. 1 to No. 2 No. 1 to No. 2 <br />Substantial completion (days): WA <br />$ 18.317.02 Ready for final payment (days): WA <br />Contract Price prior to this Change Order. Contract Times prior to this Change Order. <br />Substantial completion (days or date): August 21.2009 <br />$ 217.257.61 Ready for final payment (days or date): September 18, 2009 <br />Increase of this Change Order: increase of this Change Order. <br />Substantial completion (days or date): NIA <br />$ 7,464.25 Ready for final payment (days or date): NIA <br />Contract Price incorporating this Change Order. Contract Times with all approved Change Orders: <br />Substantial completion (days or date): August 21.2009 <br />$_ 224.721.86 Ready for final payment (days or date): September 18. 2009 <br />RECOMMENDED: ACCEPTED: ACCEPTED: <br />Br BY By. <br />Engiinneer(Auuftwized Signature) Owner (Authorized Signature) Contractor (Authorized Signature) <br />Date: S l 7 l Date: Date: <br />EJCDC No. C- 941(2002 Edition) Page 1 of 1 <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the <br />Associated General Contractors of America and the Construction Specifications Institute. 0130DO040 <br />
The URL can be used to link to this page
Your browser does not support the video tag.