Laserfiche WebLink
� � o Will need 120 volt outlet to plug unit into — not included <br /> ' Labor and material for the sum of: $8,820.00 <br /> Water Treatment Plant <br /> - Install one RUUD R96TA060 96% two stage condensing furnaces <br /> o ECM blower motor <br /> - Install one RUUD RA1330 13 SEER a/c system <br /> o TXV indoor metering device <br /> - Re-using all other equipment <br /> Labor and material for the sum of: $8,830.00 <br /> Fire Department <br /> - Install one RUUD R96TA040 96% finro stage condensing furnaces <br /> o ECM blower motor <br /> - Install one RUUD RA1324 13 SEER a/c system <br /> o TXV indoor metering device <br /> - Install one Modine PDP200A hanging unit heater <br /> - Install three Modine PTP250 hanging unit heaters <br /> - Re-using all other equipment <br /> Labor and material for the sum of: $18,350.00 <br /> Ci Hall <br /> - Install one RUUD R96TA115 96% upflow condensing furnaces <br /> o ECM blower motor <br /> - Install one RUUD R96TA115 96% counter flow condensing furnaces <br /> - Install finro RUUD RA1348 13 SEER a/c system <br /> o TXV indoor metering device <br /> - Re-using all other equipment <br /> Labor and material for the sum of: $13,980.00 <br /> Note! All equipment has a 5 year commercial parts warranty. <br /> The production of R22 freon has ended, as freon gets harder to buy—this will <br /> force a new R410A system to be installed. � <br /> � ��'� �3� . <br /> � <br /> ,� <br /> ;� r �..,,� <br /> Joe Hines <br /> Accepted by: Date: <br /> Payable in full within 30 days of invoice. <br />