Laserfiche WebLink
Pequot Lakes - Trailside Estates May 12, 2009 <br />4.r Car -Col Construction Page 2 of 3 <br />5. Insulate above watermain <br />6. Backfill <br />You will need to arrange for density and moisture tests. <br />7. Restore the surface improvements <br />With the straight watermain segments under the curvilinear streets, we are open to <br />you only needing to replace only one. side of the curb and gutter and one -half of <br />the pavement width. However, should your work carry you over the centerline, <br />you will need to replace the whole pavement width. <br />S. Re- vegetate <br />Replace topsoil (if stockpiled, otherwise, bring in new topsoil) on any disturbed <br />areas, seed, fertilize, water, etc. to get a stand of grass growing. <br />j 9. Remove erosion control devices once the grass is established. <br />! Please note that the one -year correction period starts up again on this corrective work (the <br />original one -year correction period will end August 5, 2009 on the remainder of the <br />project's improvements). <br />1.., <br />From our last meeting, it was mentioned that this situation may have occurred because a <br />sanitary sewer manhole was constructed lower than called for in the plan. We do not <br />know why the necessary number / height of barrel segments for the manhole were not on- <br />site, or why it was decided to keep on constructing without waiting to install the <br />necessary number / height of barrel segments. No matter the reason, please understand <br />that the City does not see contributing to the cost of this work. <br />Once we get your plan and corresponding schedule, the City will assign personnel to <br />observe your work. Please note that we have not had conversations with the City on if or <br />how the City will cover its own costs on this corrective work. <br />Please complete this corrective work within 3 months - this should be plenty of time for <br />this amount of work and allows for some seeding time. <br />If this work is not completed by August 15, 2009, including having a stand of grass, the <br />City will have to pursue your bond or whatever other legal means are at their disposal.. <br />If you have questions or comments, it might be best to notify the City Clerk so she can <br />convene a committee of the Council, as opposed to going before the entire City Council <br />at one of their meetings. <br />JA0130B -City ofPequot Lakes\0I30B0034Trailside FscataA0130B0034 .000 - Construction. <br />Services \Correspondence\20090512- insulate shallow depth watermain.doc . <br />