My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.01 - Trailside Estates Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
08-04-2009 Council Meeting
>
10.01 - Trailside Estates Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 11:13:13 AM
Creation date
6/18/2014 11:12:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Brainerd I Baxter <br />7804 Industrial Park Road <br />May 29, 2009 Po Box 2720 <br />Baxter, MN 56425 -2720 <br />Tel: 218.829.5117 <br />Fax: 218.829.2517 <br />Mr. Carl J. Smith, Jr. <br />Car -Col Construction and Trailside Estates, LLLP <br />19513 State Highway No. 371 <br />Brainerd, MN 56401 <br />Re: Pequot Lakes, MN <br />Trailside Estates <br />WSN No. 0130B0034 <br />Mr. Smith: <br />www.wsn.us.com <br />VIA Email and regular mail <br />I was given a copy of your July 24, 2009 letter to the City yesterday. In your letter, you <br />said you have never received guidance as to what the City wants specifically (my <br />emphasis) done to correct the shallow watermain in the Trailside development. <br />Please re- review our May 12, 2009 letter to you (we have enclosed a copy). <br />As stated in our May 12th letter, while we estimated the extent of the work based on gate <br />valve depth measurements, we asked you to provide a written plan, part of which would <br />include identifying the specific extents of work. We also asked you for a corresponding <br />bar chart schedule for your work. I know our office did not receive such a plan and <br />schedule and I am not aware that the City received one either. <br />We did communicate by Email with Landecker (and copied you and the City) on July <br />2nd in response to potholing you performed (we have enclosed a copy). We provided <br />some suggestions and asked that you address all of the sub- standard depth watermain. <br />As stated in our May 12th letter, if the work is not completed by August 15, 2009, <br />including having a stand of grass, the City will have to pursue your bond or whatever <br />other legal means are at their disposal. <br />WIDSETH SMITH NOLTING <br />Timothy M. Houle, P.E. <br />City Engineer <br />c: City of Pequot Lakes: Dawn Bittner, Sandy Peine, and Mike Loven, all via <br />Email only <br />Pate Bonding, Inc.: via regular mail only, 1276 South Roberts Street, W t <br />Paul, MN 55118; a <br />Landecker & Associates: Will Hoyt, via Email only <br />WSN: Mike Rude, Don Anderson, and WSN File wIDSETH <br />SMITH <br />MOLTING <br />engineering I architecture I land surveying I environmental services <br />
The URL can be used to link to this page
Your browser does not support the video tag.