Laserfiche WebLink
Div 131.abor S 45,000.00 45,000.0(f 45,000.00 100% <br /> Div.13 Materials S 191,613.00 191,613.00 191,613.00 100% <br /> Div.21 SpTinkltrs S 35,990.00 35,980.00 35,980.00 100% <br /> Div.22 Plumbing S 133,700.00 133,700.00 133.700.00 100°� <br /> Div.26 Electrical S 54,635.00 54,635.00 54,635.00 100% <br /> Div.31 Ea[thwork 3 69,770.00 69,770.00 69,770.00 100°h <br /> Div.32 Aggregate Paving&Base S 59,270.00 59,270.00 59,270.00 100% <br /> Div.32 Ctu'bs and Paving $ 7,760.00 7,760.00 7,760.00 100% <br /> Div.32 Chainlink Fence S 27,416.00 27,416.00 27,416.00 I00% <br /> Div.32 Sading S 15,413.00 15,413.00 15,413.00 100% <br /> GRAND TOTAL 894,000.00 894,000.00 894,000.00 100°h <br /> AIA Docirnent G703-1992.Copyrlyht O 1983.7986.1988.1967.7970.7978.1983,a�d 1992 by the Amarkan hrotRute of ArCMMcb.All Rlphb RSNrved.WARNING:Thls AIA�Document is proteded bY U.S. <br /> Covf'�ight Law and Intemalio�al Taaties.Unauthorized reproduction of disMbufion of this AIA�Document.or any portion of it.may rasult in severe civil and criminal oenakles,an�witl be prosecuted to <br /> the meximum extent posslble under the law. <br />