Laserfiche WebLink
EJCDC-= <br /> ENGINEERS 101NT CONiMCi � <br /> OOCUMENTS COMMIITEE <br /> ..._....._...._._.._.__......-. . <br /> Change Order No. 5 <br /> Date of Issuance: 07/28/2020 Effective Date: Council Approval <br /> Owner: City of Pequot Lakes Owner's Contract No.: <br /> Contractor: RL Larson Excavating, Inc. Contractor's Project No.: <br /> Engineer: Widseth Engineer's Project No.: 013060072.00 <br /> Project: Rasmussen Road&South Washington Avenue Road& Contract Name: <br /> Utilities Improvement Project <br /> The Contract is modified as follows upon execution of this Change Order: <br /> Description: Metal Pipe Railing&Delineator Posts <br /> Due to the addition of the concrete pedestrian ramp and stairs at the southeast corner of Main St.and <br /> Washington Ave. it is recommended to install a railing and delineator post for safety concerns.33 lineal feet of <br /> metal pipe railing(MnDOT Standard Plate 8400F)and two 4 3�"diameter by 36"tall steel delineator posts. Both <br /> the railing and posts will be powder coated black.The railing will be installed along the pedestrian ramp,cored <br /> and epoxied grouted into the concrete.The posts will be installed along the stairs and will be surface mounted <br /> with a base plate and anchor bolts. <br /> Pipe Railing:33 LF @$185jft=$6,105.00 <br /> Delineator Posts:2 @$800 each=$1,600.00 <br /> Attachments: None <br /> CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES <br /> _ <br /> Original Contract Price: Original.Contract Times: <br /> Substantial Completion: October 16,2020 <br /> $2.396.792.43 Ready for Final Payment: November 27.2020 <br /> days or dates <br /> Decrease from previously approved Change Orders: Increase from previously approved Change Orders: <br /> Substantial Completion: lulv 2.2020 <br /> $333.20 Ready for Final Payment: Au�ust 14,2020 <br /> Contract Price prior to this Change Order: Contract Times prior to this Change Order: <br /> Substantial Completion: October 16.2020 <br /> $2.396.459.23 Ready for Final Payment: November 27,2020 <br /> days or dates <br /> Increase of this Change Order: Increase of this Change Order: <br /> Substantial Completion: 0 <br /> $7,705.00 Ready for Final Payment: 0 <br /> days or dates <br /> Contract Price incorporating this Change Order: Contratt Times with all approved Change Orders: <br /> Substantial Completion: lulv 2.2020 <br /> $2,404,164.23 Ready for Final Payment: Au�ust 14.2020 <br /> days or dates <br /> RECOMMENDE ACCEPTED: PTED: <br /> By: �p--a— ���— By: By: <br /> Engineer Owner(Authorized Signature) Contractor Ay,thorized Signature) <br /> Title: Project Engineer rt�e r�tle c 4� <br /> Date: 07/28/2020 Date Date � -. �2 <br /> EJCDC'C-941,Cha�e Order. <br /> Prepared and published 2013 by the Engineers Jant Co�rad DocumeMs Committee. <br /> 0130B00T2.000 Page 1 of 1 <br />