My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 P & Z Administrator's Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2020
>
07-16-2020 Planning & Zoning Commission Meeting
>
08 P & Z Administrator's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 11:33:33 AM
Creation date
7/9/2020 11:33:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gently drained surface that will minimize erosion due to rainfall and which <br /> will be in substantial conformity to the adjoining land area. <br /> 1i. Four(4)inches of black topsoil shall be placed on all areas. <br /> �2.Vegetation shall be restored by appropriate seeds of grasses or planting of <br /> shrubs or trees in all parts of said mining area. <br /> i3. The banks of all excavation not backfilled shall be sloped not steeper that <br /> 3:�and said bank shall require the establishment of vegetation. <br /> i4.This extractive use shall terminate 5 years from date of approval, May 2i, <br /> 2025. <br /> i5. Reclamation of the extractive use site shall be cornpleted within one (i) <br /> year after the cessation of the operation. <br /> You have provided the Performance Bond and Storm Water Pollution and <br /> Protection Plan and are now able to move forward with your extractive use. <br /> Uses defined as Interim Uses are allowed pursuant to Minnesota Statutes after <br /> appropriate review and approval in accordance with the criteria, standards and <br /> procedures for a Conditional Use Permit contained in Section i�-11.6 (8) of the <br /> Pequot Lakes City Code which states "Failure by the owner to act on a <br /> Conditional Use Permit within i2 months, or failure to complete the work under <br /> a Conditional Use Permit within 2 years, unless extended by the Planning <br /> Commission, shall void the permit. A second extension shall require a new <br /> public hearing." If you have any questions,please feel free to contact me. <br /> Sincerely, <br /> Dawn Bittner <br /> Zoning Administrator <br /> CC: Planning Commission <br />
The URL can be used to link to this page
Your browser does not support the video tag.