Laserfiche WebLink
gently drained surface that will minimize erosion due to rainfall and which <br /> will be in substantial conformity to the adjoining land area. <br /> 1i. Four(4)inches of black topsoil shall be placed on all areas. <br /> �2.Vegetation shall be restored by appropriate seeds of grasses or planting of <br /> shrubs or trees in all parts of said mining area. <br /> i3. The banks of all excavation not backfilled shall be sloped not steeper that <br /> 3:�and said bank shall require the establishment of vegetation. <br /> i4.This extractive use shall terminate 5 years from date of approval, May 2i, <br /> 2025. <br /> i5. Reclamation of the extractive use site shall be cornpleted within one (i) <br /> year after the cessation of the operation. <br /> You have provided the Performance Bond and Storm Water Pollution and <br /> Protection Plan and are now able to move forward with your extractive use. <br /> Uses defined as Interim Uses are allowed pursuant to Minnesota Statutes after <br /> appropriate review and approval in accordance with the criteria, standards and <br /> procedures for a Conditional Use Permit contained in Section i�-11.6 (8) of the <br /> Pequot Lakes City Code which states "Failure by the owner to act on a <br /> Conditional Use Permit within i2 months, or failure to complete the work under <br /> a Conditional Use Permit within 2 years, unless extended by the Planning <br /> Commission, shall void the permit. A second extension shall require a new <br /> public hearing." If you have any questions,please feel free to contact me. <br /> Sincerely, <br /> Dawn Bittner <br /> Zoning Administrator <br /> CC: Planning Commission <br />