My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03.02 Public Hearing - Rezoning from Public and Agriculture to Patriot Development
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2020
>
07-16-2020 Planning & Zoning Commission Meeting
>
03.02 Public Hearing - Rezoning from Public and Agriculture to Patriot Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 11:22:03 AM
Creation date
7/9/2020 11:22:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c��of <br /> ���ll�t <br /> �CS� <br /> I. Socio-economic development needs of the public. <br /> J. Availability of public sewer and water utilities. <br /> K. The necessity to reserve and restore certain areas having significant historical or <br /> ecological value. <br /> L. Conflicts between land uses and impacts of commercial uses or higher densities <br /> on adjacent properties. <br /> M. Alternatives available for desired land use. <br /> N. Prevention of spot zoning. <br /> O. Conformance to the City of Pequot Lakes Comprehensive Plan. <br /> P. Conformance to the City of Pequot Lakes Future Land Use Map and any other <br /> official maps of the City. <br /> Section i�-5.6 of the Ordinance contains the requirements for the Patriot Development <br /> (PD)Zone: <br /> 1. Purpose and Intent: To support and facilitate public or private development of <br /> this area by creating recreational, commercial and industrial opportunities to <br /> enhance the value and quality of life within our community. <br /> 2. Compatibilitv: The Patriot Development zone is established on an 85 acre parcel <br /> located in the City of Pequot Lakes adjacent to four-lane Highway 371 and the <br /> Paul Bunyan State Trail. <br /> 3. Lot,Use and Densitv Requirements: <br /> PD <br /> Lot width—feet,minimum 50 <br /> Buildable lot area—square feet,minimum 10,000 <br /> Setback, right of way, City road- feet,minimum 30 <br /> Setback,right of way, County or State road, feet, minimum 30 <br /> Setback,between buildings—feet, minimum 10 <br /> Setback, side yard—feet, minimum 10 <br /> Setback, rear—feet,minimum 10 <br /> Setback, sign—feet,minimum 1 <br /> Setback, parking from building or lot line —feet, minimum 10 <br /> Impervious Coverage—percent,maximum 75 <br /> Building height—feet, maximum,principal structure—feet, maximum 35 <br /> Building height, non-occupied accessory structure—feet,maximum 25 <br /> Building above highest groundwater level—feet, minimum 3 <br /> 4. Performance Standards. The following performance standards apply to all <br /> development in this zone: <br /> A. Compatibilitv of Use. Use shall be compatible with the surrounding <br /> Pequot Lakes Staff Report 3.2-2 <br /> July i6,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.