Laserfiche WebLink
11)We are working on repairing a hydrant in the City's Industrial Park. <br /> 12)At the time of this report, we are planning on flushing and flow-testing hydrants <br /> Wednesday, July 8�'and Thursday, July 9�'. <br /> 13)Sewers were jet-cleaned from the Front St/Brown St intersection back to the Sibley St <br /> lift station. There were no complaints or sewer back-ups here,just seasonal <br /> maintenance on an old vitrified clay pipe line that gives us trouble from time to time. <br /> 14)An irrigation valve on the City's spray irrigation system was disassembled and some <br /> debris was removed. Overall, the system has been functioning well this year. We are <br /> operating ahead of schedule due to an early start and therefore should have some <br /> additional time to work on maintenance and repair of the aeration lines later this <br /> summer into fall. We recently made some repairs to the aeration piping on the south <br /> (effluent)pond. <br /> 15)Wastewater pond dikes were sprayed with herbicide for weed control on June 23rd and <br /> 24�'. <br /> 16)Monitoring wells around the City's wastewater ponds will be sampled in early July. <br /> Respectfully submitted by Andrew Schwartz, Operations Manager, Pine River Area Sanitary <br /> District. Please feel free to call my cell at 320-232-5787 with any questions/concerns for 24-hour <br /> emergency service call 218-851-9060 <br />