My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-21-2020 Planning & Zoning Commission Meeting Minutes
Laserfiche
>
Planning & Zoning
>
Minutes
>
2020
>
05-21-2020 Planning & Zoning Commission Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2020 2:50:14 PM
Creation date
6/19/2020 2:50:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Applicant shall install fencing on all sides of the excavation area as a safety barrier, <br /> as indicated on attached Exhibit B. <br /> 5. The applicant shall furnish a bond in the amount that is acceptable to the City <br /> Engineer and the Planning Commission to serve as a guarantee that the restoration <br /> and rehabilitation requirements are met to the satisfaction of the City. <br /> 6. The applicant shall submit information required in Section 8.5 "Extractive Uses <br /> and Restoration"Subparts 5 (B) (C)and(D). (These are indicated on Exhibits A& <br /> B and Map C) <br /> �. The applicant shall provide a detailed restoration plan meeting the requirements <br /> of Section 8.5"Extractive Uses and Restoration"Subpart 4,as indicated on Exhibit <br /> C. <br /> 8. The applicant shall provide soil boring data/ground water elevation for at least <br /> three boring sites throughout the excavation area. The boring locations shall be <br /> spaced at least �oo' apart. Applicant has provided soil boring data/ground water <br /> elevation for 3 boring sites throughout the excavation area. <br /> 9. Extraction operations shall take place between �:oo AM and 6:0o PM, Monday <br /> through Friday. <br /> io.The slopes surrounding the excavation area shall be graded or backfilled to contour <br /> and shape the peaks and depressions thereof, so as to produce a gently drained <br /> surface that will minimize erosion due to rainfall and which will be in substantial <br /> conformity to the adjoining land area. <br /> ii. Four(4) inches of black topsoil shall be placed on all areas. <br /> �2.Vegetation shall be restored by appropriate seeds of grasses or planting of shrubs <br /> or trees in all parts of said mining area. <br /> i3. The banks of all excavation not backfilled shall be sloped not steeper that 3:1 and <br /> said bank shall require the establishment of vegetation. <br /> i4. This extractive use shall terminate 5 years from date of approval, May 2i, 2025. <br /> �5. Reclamation of the extractive use site shall be completed within one (i) year after <br /> the cessation of the operation. <br /> Roll Call Vote: Birch-AYE; Hallan-AYE; Larson-AYE; Norton — <br /> AYE; Paulbeck—AYE; and Wilson -AYE. Motion carried. <br /> A motion was made by Planning Commission Member Hallan, seconded by <br /> Planning Commission Member Larson to close the public hearing. <br /> 4. Open Forum <br /> No one appeared under Open Forum. <br /> 5. New Business <br /> 5.� Alan Brown —Variance Extension Request <br /> Mr. Burslie explained the Staff Report. Applicant was present virtually via Zoom. <br /> MINUTES 4 <br /> Pequot Lakes Planning Commission <br /> May 2i, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.