Laserfiche WebLink
TABLE E—Public Infrastructure Sources and Uses <br /> Pro�c A�tivitks DEED :Ci�►ICou�y federa�EOA �rivate total <br /> Sanitary Sewer $250,000 $250,000 <br /> Storm Sewer $75,000 $75,000 <br /> Water $250,000 $250,000 <br /> Streets $50,000 $200,000 $250,000 <br /> Engineering* $75,000 $75,000 <br /> (co nstruction-re lated, <br /> inspection,etc.) <br /> Engineering and Admin $35,000 $35,000 <br /> (Design,legal,etc.)• <br /> Total Costs $500,000 $235,000 $200,000 $100,000 $1,035,000 <br /> Engineering incurred during construction; such as inspections and observation, is eligible for match. <br /> Administration, legal and engineering incurred before construction,such as design preparation,are not <br /> eligible for BDPI nor the match. <br /> Project Timetable <br /> Please provide a projected timetable to complete the road and infrastructure project in a format similar <br /> to TABLE F. <br /> TABLE F—Project Timetable <br /> Activny Start mm/yy Finish mmIYY <br /> Property Annexed 1/19 1/19 <br /> Property Rezoned 1/19 1/19 <br /> Initial Engineering 1/19 1/19 <br /> Easements Acquired 1/19 1/19 <br /> Resolution Approved 1/19 1/19 <br /> Declaration for public property 1/19 1/19 <br /> Permits Acquired 1/19 1/19 <br /> Project Specifications 1/19 1/19 <br /> Project Fully funded (if bonding, bonds sold) 1/19 1/19 <br /> Out for Bid 1/19 1/19 <br /> Bid Close 1/19 1/19 <br /> Award Contract/Notice to Proceed 1/19 1/19 <br /> Project Construction 1/19 1/19 <br /> Project Maps <br /> Attach color maps that illustrate: <br /> • City boundaries and where the project is located within the city <br /> • Proper zoning to accommodate the project. If zoning changes are pending, please explain how <br /> proper zoning for the project wilt be in place by project completion. <br /> • Where current and proposed infrastructure are and will be in the proposed project area <br /> 8 <br />