My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.01 Planning Commission Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
06-02-2020 City Council Meeting
>
06.01 Planning Commission Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 1:07:17 PM
Creation date
5/28/2020 1:07:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Applicant shall install fencing on all sides of the excavation area as a safety barrier, <br /> as indicated on attached Fxhibit B. <br /> 5. The applicant shall furnish a bond in the amount that is acceptable to the City <br /> Engineer and the Planning Commission to serve as a guarantee that the restoration <br /> and rehabilitation requirements are met to the satisfaction of the City. <br /> 6. The applicant shall submit information required in Section 8.5 "Extractive Uses <br /> and Restoration"Subparts 5(B) (C) and(D). (These are indicated on Exhibits A& <br /> B and Map C) <br /> �. The applicant shall provide a detailed restoration plan meeting the requirements <br /> of Section 8.5"Fxtractive Uses and Restoration"S art 4,as indicated on Exhibit <br /> C. <br /> 8. The applicant shall provide soil boring da «' �nd water elevation for at least <br /> . �� w,.. <br /> three boring sites throughout the excava �, �The boring locations shall be <br /> spaced at least ioo' apart. Applicant h � ' �'de��boring data/ground water <br /> ��„r �, <br /> elevation for 3 boring sites througho � excavation <br /> 9. Extraction operations shall take p. ��. etween �:oo „,. y�d 6:0o PM, Monday <br /> through Friday. �"`' �:��; <br /> �o.The slo es surroundin the excavatio� shall��graded or `` lled to contour <br /> P g �!!�a �. <br /> and shape the peaks and depressions � �" ��s to produ ������ ently drained <br /> surface that will minimize erosion due to v� ` and which will b{ 'in substantial <br /> conformity to the adjoining lanri area. ���`,�� <br /> 11. Four (4) inches of black topsoil shali be placed `' areas. <br /> i2.Vegetation shall be restored by appropriate seeds ��sses or planting of shrubs <br /> or trees in all parts of said mining area. `=` <br /> i3. The banks of all excavation not backfilled shall be sloped not steeper that 3:i and <br /> said bank shall require the establishment of vegetation. <br /> i4. This extractive use shall terminate 5 years from date of approval, May 2�, 2025. <br /> i5. Recl „, Qn of the extractive use site shall be completed within one (�)year after <br /> tl� ��"�`� "���f the operation. � <br /> �. , > <br /> �,�,�c33. �� ' <br /> Roll�Vote: Birc"�t►��YE; Hallan-AYE; Larson -AYE; Norton — <br /> AYE; Pa�eck—AYE;��►,d Wilson-AYE. Motion carried. <br /> �:r<:: <br /> A motion was m�;d�by Pl�aning Commission Member Hallan, seconded by <br /> Planning Commis�rn��nber Larson to close the public hearing. <br /> 4. Ouen Forum <br /> No one appeared under Open Forum. <br /> 5. New Business <br /> 5.� Alan Brown —Variance Extension Request <br /> Mr. Burslie explained the Staff Report. Applicant was present virtually via Zoom. <br /> MINUTES 4 <br /> Pequot Lakes Planning Commission <br /> May 2i, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.