Laserfiche WebLink
A motion was made by Planning Commission Member Wilson, seconded by <br /> Planning Commission Member Hallan,to approve the Interim Use Permit <br /> and Resolution, contingent upon receiving the Bond and Storm Water <br /> Pollution and Protection Plan,based on the following Findings of Fact: <br /> �. The subject property meets the minimum lot size and use standards for the <br /> Agriculture zone,being�o acres in size, more than 50o feet wide, and having <br /> ample space within the building envelope for the proposed operation. <br /> 2. The subject property lies within the Extractive Use Overlay District. <br /> 3. Applicant has supplied the required information including a site plan, a <br /> description for restoration, and has indicted that Wild Acres Road will serve as <br /> the primary haul route. <br /> 4. Applicant has proposed to excavate an approximate i8 acre area, including an <br /> approximate 5.25 acre stockpile/prci�essing area. This exc�vation area is more <br /> than 5o feet from all property lines." ` <br /> 5. The proposed excavation area is more than 5o feet from the right-of-way of Wild <br /> Acres Road,being appro ' ly 83o feet from the right-of-way. <br /> 6. Applicant has indicated si d locked g�te as barriers to the site. <br /> �. Applicant has indicated exi ` '1 will be removed and placed along the east <br /> and west excavation areas <br /> 8. The excavation ' more th f` oo fe the nearest residence,located on <br /> the parcel di � f the e `` a ' ere is also a residence on the <br /> property to $ horthw hat is a ately , ' feet from the excavation <br /> area. The ne " lake, I d Lake e north, is more than 3,00o feet from the <br /> processing area,R ` th `" t strea ' more than one mile to the north of the <br /> sit�. 'i���avati an ���` mile outside the Wellhead Protection <br /> - �.�� �_�;: <br /> � �t � �� , <br /> 9 �cavation wi���occ � water- ucing depth as approximately 3o feet <br /> �`ro,m�the existing atio be excavated. Applicant has indicated that depth <br /> .v. ,, <br /> to s� `` ated soil aft � ateri emoved is estimated to be 5d to 60'. <br /> io.Appli�-has applied,�r a Con� ruction Stormwater General Permit from the <br /> MPCA. � ��.�.� g:��:. <br /> ��. Applicant h�indicated the location of a holding pond for stormwater runoff and <br /> their plan to r`��i,�excavation area. <br /> i2.Applicant has sta��ey plan to reclaim the pit area by sloping the banks, <br /> grading the pit floor, reapply the top soil, and seed with vegetation such as rye, <br /> timothy, alfalfa, and clover to all disturbed areas. <br /> i3. City Code requires 4 inches of black topsoil be placed on all areas,vegetation <br /> shall be restored by planning of appropriate grass seeds or planting of shrubs or <br /> trees,banks of excavation not backfilled shall be sloped to 3:i slope, and <br /> reclamation of extractive use sites and haul roads shall be completed within i <br /> year after cessation of the operation. <br /> i4. The proposed extractive use is an appropriate use in the Agriculture zone; <br /> extractive uses are listed as interim uses in the Agriculture zone. <br /> MINUTES 2 <br /> Pequot Lakes Planning Commission <br /> May 2i, 2020 <br />