My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 P & Z Administrator's Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2020
>
05-21-2020 Planning & Zoning Commission Meeting
>
08 P & Z Administrator's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 9:45:56 AM
Creation date
5/15/2020 9:45:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the restoration and rehabilitation requirements are met to the satisfaction <br /> of the City. <br /> 6. The applicant shall submit information required in Section 8.5 "Extractive <br /> Uses and Restoration" Subparts 5 (B) (C)and(D). <br /> �. The applicant shall provide a detailed restoration plan meeting the <br /> requirements of Section 8.5"Extractive Uses and Restoration"Subpart 4. <br /> 8. The applicant shall provide soil boring data/ground water elevation for at <br /> least three boring sites throughout the excavation area. T'he boring <br /> locations shall be spaced at least ioo' apart. <br /> 9. F.�ctraction operations shall take place between 6:0o AM and 6:0o PM, <br /> Monday through Friday. <br /> io.The slopes surrounding the excavation area shall be graded or backfilled to <br /> contour and shape the peaks and depressions thereof, so as to produce a <br /> gently drained surface that will minimize erosion due to rainfall and which <br /> will be in substantial conformity to the adjoining land area. <br /> 11. Four(4)inches of black topsoil shall be placed on all areas. <br /> i2.Vegetation shall be restored by appropriate seeds of grasses or planting of <br /> shrubs or trees in all parts of said mining area. <br /> i3.The banks of all excavation not backfilled shall be sloped not steeper that <br /> 3:i and said bank shall require the establishment of vegetation. <br /> i4.This extractive use shall terminate 5 years from date of approval,April i6, <br /> 2025. <br /> i5. Reclamation of the extractive use site shall be completed within one (i) <br /> year after the cessation of the operation. <br /> The City prepares a staff report for the Planning Commission prior to the <br /> meeting. The report will discuss the pertinent ordinances and an evaluation and <br /> recommendations on your application. A copy of the report will be available at <br /> City Hall for you to read no later than a week before the meeting or on-line at <br /> www.�equotlakes-mn.gov. <br /> If you have any questions or concerns prior to the meeting,do not hesitate to <br /> contact us. <br /> Sincerely, <br /> Dawn Bittner <br /> Zoning Specialist <br /> CC: Planning Commission <br />
The URL can be used to link to this page
Your browser does not support the video tag.