Laserfiche WebLink
elevations were accomplished in compliance with the conditions of this <br /> variance approval and the standards of the Floodplain Management <br /> Overlay District. <br /> �. Gutters shall be installed on the north and south sides of the dwelling. <br /> Stormwater shall be directed to the "existing depression area" identified <br /> on the survey. <br /> a. The planning commission should consider requiring a more <br /> comprehensive stormwater management plan. <br /> Applicable Regulations: <br /> Section 17-11.7 VARIANCES <br /> 9. Failure by the owner to act within 6 months on a Variance unless extended <br /> by the Board of Adjustment shall void the Variance. A second extension shall <br /> require a new public hearing. This provision shall apply to any Variance <br /> outstanding at the time of the Ordinance adoption. <br /> Planning Commission Direction: The Planning Commission can approve <br /> the extension request, deny the e�ension, or table the request if additional <br /> information is needed. If the motion is for approval or denial, Findings of Fact <br /> should be cited. <br /> Staff Findings: Staff provides the following Findings of Fact for consideration <br /> by the Planning Commission: <br /> �. Circumstances out of applicant's control have prevented him from <br /> beginning construction of the new cabin. <br /> Staff Recommendation: We recommend that the variance request to <br /> construct a new cabin within the lake setback allowed be approved, based on the <br /> above findings and subject to the following conditions: <br /> i. All conditions of the October 1�, 2oi9 approval remain; <br /> 2. Applicant shall act upon the October i�, 2oi9 approval by October i9, <br /> 202o OR Apri121, 2o2i? <br /> Pequot Lakes Staff Report 5-i(4) <br /> May 2i,2020 <br />