Laserfiche WebLink
EXH I BIT C <br /> Restoration plan <br /> All extraction / mining area and haul road will be restored to the City of <br /> Pequot Lakes requirements. <br /> All excavation area will be graded to contour and shape out any berms <br /> to minimize any erosion due to rain fall, four inches of black topsoil will <br /> be place on all areas. Haul road will be restored to same condition prior <br /> to extraction operation. <br /> Vegetation will be restored by appropriate seed of grasses. <br /> All banks of excavation area not backfilled will be sloped no steeper <br /> than 3 foot horizontal and 1 foot vertical and planted with vegetation. <br /> Reclamation of extractive use site and designated haul road shall be <br /> complete with in one year of permit ending. <br />